Projects — TIB Funding Cycles
FY 2022 APP Selections
|
|
||||
Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2022 Arterial Preservation Program (APP) |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 31,554 | 3,506 | 35,060 |
Right of Way | 0 | 0 | 0 |
Construction | 259,187 | 28,798 | 287,985 |
Project Totals | $290,741 | $32,304 | $323,045 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
This project will plane the roadway and apply crack seal, overlay East Washington between 14th and 18th, and replace the traffic loops, before restriping. The city will fund the ADA ramps on their own.