Projects — TIB Funding Cycles
FY 2021 APP Selections
|
|
||||
Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 27,630 | 3,070 | 30,700 |
Right of Way | 0 | 0 | 0 |
Construction | 212,085 | 23,565 | 235,650 |
Project Totals | $239,715 | $26,635 | $266,350 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
This project includes planing the roadway, applying crack seal, and overlaying Stover Road between East Stover Road to Coleen Way before restriping. Minor adjustments to utilities include manholes and valve boxes. The City is also including installation of six ADA compliant ramps and minimal associated curb and gutter.