There are no pedestrian access routes to Culbertson Park and the Crisis Support Network / Boys and Girls Club building on 2nd Street NE
Projects — TIB Project Information
TIB Project Information
City of Long Beach's 2nd Street NE Sidewalk
P-W-970(P01)-1
P-W-970(P01)-1
2nd Street NE Sidewalk
Washington Ave S to 600ft e/o Washington Ave S
FY 2025 Active Transportation Program
Current Phase : Audit
Total TIB Funding : $240,926
County: Pacific | Legislative District: 19 | Project Length: 550.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 09/02/2025
Project Information
| Lead Agency | LONG BEACH |
| Funding Year | 2025 |
| Program | ATP |
| Current Phase | Audit |
| Legislative District | 19 |
| Congressional District | 3 |
| Federal Route Number | 9999 |
| Project Length | 550.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Pedestrian |
| Project Contact | Brian Bollen |
| Contact Email | bbollen@g-o.com |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 09/02/2025 |
| Cultural Resource Assessment | CRA & BER |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/01/2023 | |
| Delayed Project Date | 07/01/2026 | |
| DAHP Assessment Date | 05/01/2024 | |
| Predesign Approval | ||
| Design Approval | 01/30/2024 | 12/20/2023 |
| Bid Auth. Approval | 12/31/2024 | 11/04/2024 |
| Construction Approval | 12/15/2024 | 12/11/2024 |
| Project Closeout | 09/01/2025 | 08/29/2025 |
| Audit Date | 09/02/2025 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 38,760 | 40,800 |
| Right of Way | 0 | 0 |
| Total Design | 38,760 | 40,800 |
| Construction Engineering | 38,760 | 26,000 |
| Construction Contract | 258,780 | 189,853 |
| Other Construction | 0 | 0 |
| Total Construction | 297,540 | 215,853 |
| Funding Surplus | - 95,374 | |
| Total TIB Funding | 240,926 | 256,653 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| LONG BEACH | 15,727 | 6.1% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 15,727 | 6.1% |
Project Description
Install a new 5 foot concrete sidewalk on the South side of 2nd Street NE from Washington Avenue to approximately 550 feet to the East
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements;
- Removes ADA barriers
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||