West Main Street is a main pedestrian corridor connecting to the City of Elma Middle and High Schools. Many of the curb ramps along West Main Street, between 14th Street and 18th Street are not ADA compliant and are missing crosswalks. There is a need to improve safety along this section. In addition, Main Street is an asphalt concrete pavement roadway with a pavement condition rating (PCR) between 50 to 63 (poor) between 14th Street and 18th Street and there is a need to improve the pavement condition along this section.
Projects — TIB Project Information
TIB Project Information
City of Elma's W Main Street ADA
P-W-955(P07)-1
P-W-955(P07)-1
W Main Street ADA
16th St to 18th St
FY 2025 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $365,170
County: Grays Harbor | Legislative District: 24 | Project Length: 820.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | ELMA |
Funding Year | 2025 |
Program | ATP |
Current Phase | Construction |
Legislative District | 24 |
Congressional District | 6 |
Federal Route Number | 5189 |
Project Length | 820.00 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Rick Eaton |
Contact Email | pwdirector@cityofelma.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | 01/02/2024 | |
Predesign Approval | ||
Design Approval | 02/15/2024 | 02/05/2024 |
Bid Auth. Approval | 06/18/2024 | 06/10/2024 |
Construction Approval | 07/08/2024 | 07/18/2024 |
Project Closeout | 10/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 50,160 | 52,800 |
Right of Way | 0 | 0 |
Total Design | 50,160 | 52,800 |
Construction Engineering | 50,160 | 35,905 |
Construction Contract | 334,400 | 300,685 |
Other Construction | 0 | 0 |
Total Construction | 384,560 | 336,590 |
Funding Surplus | - 69,550 | |
Total TIB Funding | 365,170 | 389,390 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ELMA | 24,220 | 6.2% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 24,220 | 6.2% |
Project Description
Pedestrian safety along West Main Street can be improved by removing and reinstalling existing curb ramps to current ADA standards and installing crosswalks between 18th Street and 16th Street.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |