Safe and direct pedestrian access is a critical need between a main entrance to Town on NW Madrona Way and the downtown businesses. A sidewalk on NW 1st Street will complete a critical pedestrian link in a commercial area of Town. The proposed sidewalk will be a part of the main pedestrian access between N Main Street and essential services and housing for the community on NW 1st Street.
Projects — TIB Project Information
TIB Project Information
Town of Coupeville's NW Coveland and 1st Street Sidewalk
P-W-827(P08)-1
P-W-827(P08)-1
NW Coveland and 1st Street Sidewalk
NW Coveland
FY 2023 Sidewalk Program
Current Phase : Audit
Total TIB Funding : $80,501
County: Island | Legislative District: 10 | Project Length: 0.08 | TIB Engineer: Chris Langhoff | Last Payment Date: 07/17/2023
Project Information
Lead Agency | COUPEVILLE |
Funding Year | 2023 |
Program | SP |
Current Phase | Audit |
Legislative District | 10 |
Congressional District | 2 |
Federal Route Number | 9999 |
Project Length | 0.08 mi. |
ADT | 500 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Kelly Riepma |
Contact Email | publicworks@townofcoupeville.org |
TIB Engineer | Chris Langhoff |
Last Payment Date | 07/17/2023 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2022 | 02/11/2022 |
Bid Auth. Approval | 02/15/2022 | 05/20/2022 |
Construction Approval | 06/01/2022 | 08/26/2022 |
Project Closeout | 06/30/2023 | 07/14/2023 |
Audit Date | 07/17/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 11,162 | 19,308 |
Right of Way | 0 | 0 |
Total Design | 11,162 | 19,308 |
Construction Engineering | 16,213 | 465 |
Construction Contract | 97,625 | 65,183 |
Other Construction | 11,875 | 0 |
Total Construction | 125,713 | 65,648 |
Funding Surplus | - 56,374 | |
Total TIB Funding | 80,501 | 84,955 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COUPEVILLE | 4,454 | 5.2% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 4,454 | 5.2% |
Project Description
Extend the existing sidewalk along NW Coveland by adding approximately 100 LF of sidewalk to connect to the wide asphalt shoulder on Madrona that is currently used for pedestrian access to Town. Install approximately 300 LF of concrete sidewalk connecting the existing sidewalk on N Main with that of NW 1st.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |