This project will address the need for safe pedestrian travel to and from the downtown businesses as well as public beach access where a wood boardwalk has rotten and allows for trips and slips.
Projects — TIB Project Information
TIB Project Information
Town of Coupeville's Front and N Main Street Sidewalks
P-W-827(P10)-1
P-W-827(P10)-1
Front and N Main Street Sidewalks
Multiple Locations
FY 2024 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $170,060
County: Island | Legislative District: 10 | Project Length: 0.05 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | COUPEVILLE |
| Funding Year | 2024 |
| Program | ATP |
| Current Phase | Construction |
| Legislative District | 10 |
| Congressional District | 2 |
| Federal Route Number | 9999 |
| Project Length | 0.05 mi. |
| ADT | 500 |
| Functional Class | TIB Arterial |
| Type of Work | Pedestrian |
| Project Contact | Joe Grogan |
| Contact Email | publicworks@townofcoupeville.org |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | CRA & BER |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/02/2022 | |
| Delayed Project Date | 01/01/2024 | |
| DAHP Assessment Date | 10/18/2024 | |
| Predesign Approval | ||
| Design Approval | 02/01/2023 | 02/06/2023 |
| Bid Auth. Approval | 12/01/2024 | 11/25/2024 |
| Construction Approval | 02/01/2025 | 04/07/2025 |
| Project Closeout | 10/31/2025 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 16,414 | 96,500 |
| Construction Contract | 308,709 | 388,211 |
| Other Construction | 0 | 0 |
| Total Construction | 325,123 | 484,711 |
| Funding Surplus | - 155,063 | |
| Total TIB Funding | 170,060 | 484,711 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| COUPEVILLE | 314,651 | 64.9% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 314,651 | 64.9% |
Project Description
Replace existing wood boardwalk with concrete sidewalk on Front Street and extend sidewalk along Main Street.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||