NE 24th Street between Evergreen Point Rd and 84th Ave has 17 non-compliant ADA ramps.
Projects — TIB Project Information
TIB Project Information
City of Medina's NE 24th Street ADA Upgrade
P-P-109(P05)-1
P-P-109(P05)-1
NE 24th Street ADA Upgrade
Evergreen Point Rd to 84th Ave
FY 2025 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $318,675
County: King | Legislative District: 48 | Project Length: 2,550.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | MEDINA |
Funding Year | 2025 |
Program | ATP |
Current Phase | Construction |
Legislative District | 48 |
Congressional District | 1 |
Federal Route Number | 2058 |
Project Length | 2550.00 mi. |
ADT | 750 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Ryan Osada |
Contact Email | rosada@medina-wa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 12/06/2023 |
Bid Auth. Approval | 04/01/2024 | 03/29/2024 |
Construction Approval | 04/23/2024 | 04/24/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 31,185 | 34,650 |
Right of Way | 0 | 0 |
Total Design | 31,185 | 34,650 |
Construction Engineering | 31,185 | 47,650 |
Construction Contract | 207,900 | 274,372 |
Other Construction | 0 | 0 |
Total Construction | 239,085 | 322,022 |
Funding Increase | 48,405 | |
Total TIB Funding | 318,675 | 356,672 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MEDINA | 37,997 | 10.7% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 37,997 | 10.7% |
Project Description
This project replaces 17 existing ramps with ADA compliant ramps along NE 24th Street between Evergreen Point Rd and 84th Avenue.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |