Currently, OIE Highway is operating at a reduced structural load carrying capability due to failing road surface, subsurface, and crumbling shoulders at the fog line. Load and width limits are currently imposed on OIE Highway in the project limits. Currently, there is no intersection lighting, an isolated curb and gutter in Segment 2, and no cyclist or pedestrian facilities exist along Segments 1 3 in this application. Prosser School District is improving its property near OIE Highway and Albro Road to add a new elementary school. In the same proximity as the school, a 154-unit housing development was recently approved and in 2021, new water and sewer were installed for the development. Though there has been limited pedestrian and bicycle activity on this freight corridor between Prosser and Grandview in the past, presence of walkers and rollers is about to change significantly.
Projects — TIB Project Information
TIB Project Information
City of Prosser's Old Inland Empire Highway Sidewalk
P-E-923(P01)-1
P-E-923(P01)-1
Old Inland Empire Highway Sidewalk
W C/L to Wine Country Rd
FY 2024 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $168,425
County: Benton | Legislative District: 16 | Project Length: 0.77 | TIB Engineer: Jonathan Heusman | Last Payment Date: 04/10/2024
Project Information
Lead Agency | PROSSER |
Funding Year | 2024 |
Program | ATP |
Current Phase | Construction |
Legislative District | 16 |
Congressional District | 4 |
Federal Route Number | 3743 |
Project Length | 0.77 mi. |
ADT | 2,224 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Marty Groom |
Contact Email | mgroom@ci.prosser.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 04/10/2024 |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 01/01/2024 | |
DAHP Assessment Date | 07/23/2014 | |
Predesign Approval | ||
Design Approval | 02/01/2023 | 12/16/2022 |
Bid Auth. Approval | 03/15/2023 | 04/11/2023 |
Construction Approval | 06/29/2023 | 07/07/2023 |
Project Closeout | 06/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 19,673 | 230,100 |
Construction Contract | 151,327 | 1,489,986 |
Other Construction | 0 | 0 |
Total Construction | 171,000 | 1,720,086 |
Funding Surplus | - 2,575 | |
Total TIB Funding | 168,425 | 1,720,086 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
PROSSER | 28,770 | 1.7% |
WSDOT Funding | 0 | 0.0% |
Benton-Franklin Council of Governments 2019 STBGTAP | 372,818 | 21.7% |
BentonFranklin Council of Governments 2022 STBGTAP | 234,577 | 13.6% |
Federal Highways Administration NHFP | 883,000 | 51.3% |
Benton-Franklin Council of Governments 2023 CRP | 32,496 | 1.9% |
Total Local Funding | 1,551,661 | 90.2% |
Project Description
Imminent conflict, with vulnerable transportation users on this otherwise narrow, rural, freight road with no shoulders, bike lanes, or sidewalks, can be mitigated with this project. OIE highway is one of two well-traveled truck routes used to bring produce from nearby farms to the Citys food processing facilities, allowing local and regional freight movement without adding trips on nearby I-82. Completion of the project will improve the structural load carrying capability for OIE Highway, eliminating the need for load and width limits in the project area. The lighting, curb, bike lane, and gutter improvements will make cyclist and pedestrian movements attractive when the Prosser School District improves its property near OIE Highway and Albro Road. Providing active transportation options may reduce future motorized congestion and promote active, healthy communities on a roadway with no current pedestrian or bicycle facilities in place.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |