The existing streets currently have a paved shoulder of 2 feet. At most locations the ground slopes steeply beyond the pavement edge making it difficult to safely accommodate pedestrians outside of traveled way. When snow is present the problem is worse. Un-controlled on-street parking adds to this problem as well. This sidewalk connection was identified by the Towns Non-Motorized Transportation Plan as a high priority to make this connection between previously constructed sidewalk and trail improvements. The proposed sidewalks provide a safe ADA accessible pedestrian corridor separated from traffic that connects existing sidewalks and provides pedestrian connectivity between the Central Business District (CBD), residential area, tourist facilities including a campground and museum. The sidewalk will also serve as a pedestrian bypass for hte congested SR 20 corridor one block south. The project will also install an infiltration storm drainage system minimizing runoff and erosion.
Projects — TIB Project Information
TIB Project Information
Town of Winthrop's Castle Avenue Sidewalk
P-E-887(P01)-1
P-E-887(P01)-1
Castle Avenue Sidewalk
Roses Hill Rd to Bridge Street Vicinity
FY 2023 Sidewalk Program
Current Phase : Design
Total TIB Funding : $571,402
County: Okanogan | Legislative District: 12 | Project Length: 0.47 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/07/2023
Project Information
Lead Agency | WINTHROP |
Funding Year | 2023 |
Program | SP |
Current Phase | Design |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.47 mi. |
ADT | 750 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Pete Cowger |
Contact Email | pcowger@varela-engr.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/07/2023 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
Predesign Approval | ||
Design Approval | 02/01/2022 | 01/25/2022 |
Bid Auth. Approval | 02/15/2023 | |
Construction Approval | 03/01/2023 | |
Project Closeout | 07/01/2023 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 65,931 | 69,401 |
Right of Way | 0 | 0 |
Total Design | 65,931 | 69,401 |
Construction Engineering | 65,931 | 69,401 |
Construction Contract | 439,540 | 462,674 |
Other Construction | 0 | 0 |
Total Construction | 505,471 | 532,075 |
Total TIB Funding | 571,402 | 601,476 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WINTHROP | 30,074 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 30,074 | 5.0% |
Project Description
***Board Approved Change 1/27*** Install sidewalk on north side of Castle Avenue from Roses Hill Road to Bridge Street Vicinity (approximately within 100'). Reduce pavement width to 24'.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |