TIB Project Information

City of Leavenworth's Ski Hill Drive Sidewalk

P-E-850(P06)-1

P-E-850(P06)-1
Ski Hill Drive Sidewalk

Evans St and SR 2

FY 2023 Sidewalk Program
Current Phase : Construction
Total TIB Funding : $383,965

County: Chelan   |   Legislative District: 12   |   Project Length: 0.31   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 11/07/2023

Project Information

Lead Agency LEAVENWORTH
Funding Year 2023
Program SP
Current Phase Construction
Legislative District 12
Congressional District 8
Federal Route Number 9999
Project Length 0.31 mi.
ADT 450
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Tom Wachholder
Contact Email twachholder@cityofleavenworth.com
TIB Engineer Andrew Beagle
Last Payment Date 11/07/2023
Cultural Resource Assessment IDP

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2024  
DAHP Assessment Date   03/06/2023
Predesign Approval
Design Approval 01/01/2022 01/18/2022
Bid Auth. Approval 03/31/2023 03/21/2023
Construction Approval 05/11/2023 05/30/2023
Project Closeout 02/15/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 38,505 56,514
Right of Way 0 0
Total Design 38,505 56,514
     
Construction Engineering 38,505 65,534
Construction Contract 256,955 413,811
Other Construction 0 0
Total Construction 295,460 479,345
     
Funding Increase 50,000  
Total TIB Funding 383,965 535,859

Local Funding Partners

Funding Amount Percent
LEAVENWORTH 151,894 28.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 151,894 15.0%

Project Description

To enhance pedestrian safety and accessibility, the project would construct new sidewalks along the west side of Ski Hill Drive to fill in gaps in the existing sidewalk and build ADA compliant sidewalk curb ramps at intersections. When completed, the sidewalks on Ski Hill Drive will complete a pedestrian facility loop through the residential area, along Ski Hill Drive, Evans Street, and SR 2.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.