The amount requested in this Sidewalk Program application is the sidewalk replacement cost of a larger reconstruction project. Roadway reconstruction is funded by the Surface Transportation Program. The sidewalk elements included in this application include ADA improvements, sidewalk, and bulb-outs necessary to meet intermodal transportation needs within the downtown core. These improvements are a continuation of the Citys downtown revitalization multi-phased project which intends to increase economic stability by replacing aging and nonscript infrastructure. The improvements will construct complete streets elements to encourage intermodal transportation and enhance pedestrian safety.
Projects — TIB Project Information
TIB Project Information
City of Sunnyside's 6th Street
P-E-179(P04)-1
P-E-179(P04)-1
6th Street
North Ave to Decatur Ave
FY 2023 Sidewalk Program
Current Phase : Audit
Total TIB Funding : $357,900
County: Yakima | Legislative District: 15 | Project Length: 0.41 | TIB Engineer: Jonathan Heusman | Last Payment Date: 03/17/2025
Project Information
Lead Agency | SUNNYSIDE |
Funding Year | 2023 |
Program | SP |
Current Phase | Audit |
Legislative District | 15 |
Congressional District | 4 |
Federal Route Number | 6335 |
Project Length | 0.41 mi. |
ADT | 8,900 |
Functional Class | Minor |
Type of Work | Pedestrian |
Project Contact | Shane Fisher |
Contact Email | sfisher@sunnyside-wa.gov |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 03/17/2025 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 01/01/2023 | |
DAHP Assessment Date | 10/20/2014 | |
Predesign Approval | ||
Design Approval | 01/01/2022 | 12/27/2021 |
Bid Auth. Approval | 07/08/2022 | 08/01/2022 |
Construction Approval | 09/15/2022 | 10/25/2022 |
Project Closeout | 12/31/2024 | 03/14/2025 |
Audit Date | 03/17/2025 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 37,647 | 444,000 |
Construction Contract | 289,593 | 3,884,517 |
Other Construction | 0 | 0 |
Total Construction | 327,240 | 4,328,517 |
Funding Increase | 30,660 | |
Total TIB Funding | 357,900 | 4,328,517 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SUNNYSIDE | 406,352 | 9.4% |
WSDOT Funding | 0 | 0.0% |
STP Funds | 3,564,265 | 82.3% |
Total Local Funding | 3,970,617 | 91.7% |
Project Description
This project will include new sidewalk infrastructure and ADA ramps, a railroad crossing treatment, and bulbouts.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |