Jadwin Avenue is a collector street that accesses Lewis and Clark Elementary School. It is the primary walk route for students accessing the school within the adjacent neighborhood. Jadwin Avenue currently does not have sidewalks on the east side and little to no accessible curb ramps connecting to adjacent streets. This project is needed to provide a safe, comfortable and accessible walk route for school children and the neighboring community at-large.
Projects — TIB Project Information
TIB Project Information
City of Richland's Jadwin Avenue Sidewalk
P-E-171(P06)-1
P-E-171(P06)-1
Jadwin Avenue Sidewalk
Davenport St to Gillespie St
FY 2024 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $222,303
County: Benton | Legislative District: 8 | Project Length: 1,380.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | RICHLAND |
Funding Year | 2024 |
Program | ATP |
Current Phase | Construction |
Legislative District | 8 |
Congressional District | 4 |
Federal Route Number | 3487 |
Project Length | 1380.00 mi. |
ADT | 2,519 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Carlo DAlessandro |
Contact Email | cdalessandro@ci.richland.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | 03/02/2023 | |
Predesign Approval | ||
Design Approval | 02/28/2023 | 02/15/2023 |
Bid Auth. Approval | 10/01/2023 | 09/29/2023 |
Construction Approval | 01/01/2024 | 01/10/2024 |
Project Closeout | 10/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 17,333 | 47,944 |
Right of Way | 0 | 0 |
Total Design | 17,333 | 47,944 |
Construction Engineering | 8,667 | 4,607 |
Construction Contract | 199,324 | 247,860 |
Other Construction | 0 | 0 |
Total Construction | 207,991 | 252,467 |
Funding Surplus | - 3,021 | |
Total TIB Funding | 222,303 | 300,411 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
RICHLAND | 78,108 | 26.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 78,108 | 26.0% |
Project Description
Construct sidewalk, ADA-accessible curb ramps, crosswalks, RRFBs and signage on the east side of Jadwin Avenue from Davenport Street to Gillespie St.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements;
- Creates direct access to school complex/business district/etc.;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |