Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of North Bonneville's Complete Streets Award

C-W-973(001)-1

C-W-973(001)-1
Complete Streets Award

Jan 2017 Selection

FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $125,000

County: Skamania   |   Legislative District: 14   |   Project Length: 0.10   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 02/27/2017

Project Information

Lead Agency NORTH BONNEVILLE
Funding Year 2018
Program CSP
Current Phase Audit
Legislative District 14
Congressional District 3
Federal Route Number 9999
Project Length 0.10 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Steve Hasson
Contact Email Steve@northbonneville.net
TIB Engineer Chris Langhoff
Last Payment Date 02/27/2017
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   02/07/2017
Delayed Project Date 07/01/2019  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/07/2017
Bid Auth. Approval 02/15/2017
Construction Approval 02/15/2017 02/07/2017
Project Closeout 02/07/2020 01/06/2020
Audit Date   01/07/2020
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 125,000 125,000
Other Construction 0 0
Total Construction 125,000 125,000
     
Total TIB Funding 125,000 125,000

Local Funding Partners

Funding Amount Percent
NORTH BONNEVILLE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
Trails and Crosswalk Pedestrian Dec 2016 $65,000 $ 0
Project consists of asphalt walkways, 4 ADA ramps and crosswalk striping for the two crossings. Project also connects new City Trail Hub to new pedestrian bridges and access to National Forest.
City Park Intersection Improvements Pedestrian Dec 2016 $35,000 $75,132
Project Consists of installing 3 stop signs, 2 short asphalt walkways, 2 ADA ramps, and crosswalk striping. The project also connects existing pathwyas and provides safer access between popular points.
City Pathway Repair Pedestrian Dec 2016 $90,000 $49,868
Repair root heave damage and deterioiration of the City pathway system improving safety.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments