Projects — TIB Project Information
TIB Project Information
City of Battle Ground's Complete Streets Award
C-W-948(001)-1
C-W-948(001)-1
Complete Streets Award
March 2019 Selection
FY 2020 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $350,000
County: Clark | Legislative District: 18 | Project Length: 0.10 | TIB Engineer: Chris Langhoff | Last Payment Date: 07/08/2019
Project Information
Lead Agency | BATTLE GROUND |
Funding Year | 2020 |
Program | CSP |
Current Phase | Construction |
Legislative District | 18 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | Local Access |
Type of Work | Pedestrian |
Project Contact | Marit Ernst |
Contact Email | marit.enrst@cityofbg.org |
TIB Engineer | Chris Langhoff |
Last Payment Date | 07/08/2019 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/28/2019 | |
Delayed Project Date | 07/01/2021 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 05/01/2019 | 05/21/2019 |
Bid Auth. Approval | 05/01/2019 | 05/21/2019 |
Construction Approval | 05/01/2019 | 05/21/2019 |
Project Closeout | 04/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 350,000 | 350,000 |
Other Construction | 0 | 0 |
Total Construction | 350,000 | 350,000 |
Total TIB Funding | 350,000 | 350,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BATTLE GROUND | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Non-montorized Action Plan | Planning | Mar 2019 | $65,000 | $52,867 | |
Consultant to provide plan for rational system of connected bicycle and pedestrian loops. | |||||
Bike Loop Signage and Street Markings | Pedestrian; Bicycle | Mar 2019 | $35,000 | $ 0 | |
Implementation of Phase 1 of Non-motorized Action Plan with wayfinding signage and sharrows. | |||||
ADA Ramps | Pedestrian | Mar 2019 | $100,000 | $ 0 | |
Replace non-compliant ADA ramps on collector and arterial roads. | |||||
Mid-block Crossing in Old Town Commercial District | Pedestrian; Bicycle | Mar 2019 | $50,000 | $ 0 | |
Provide mid-block crossing on Main St, between SE 4th Ave and SE Clark Ave(650'), with rectangular rapid flash beacon and curb extensions containing bike racks. | |||||
Hidden Meadows Traffic Calming | Pedestrian | Mar 2019 | $100,000 | $ 0 | |
Provide traffic calming for area that has experineced two pedestrian traffic accidents. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |