Projects — TIB Project Information
TIB Project Information
City of Poulsbo's Complete Streets Award
C-W-158(001)-1
C-W-158(001)-1
Complete Streets Award
March 2022 Selection
FY 2023 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $600,000
County: Kitsap | Legislative District: 23 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 09/16/2022
Project Information
| Lead Agency | POULSBO |
| Funding Year | 2023 |
| Program | CSP |
| Current Phase | Audit |
| Legislative District | 23 |
| Congressional District | 6 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Diane Lenius |
| Contact Email | dlenius@cityofpoulsbo.com |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 09/16/2022 |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 03/30/2022 | |
| Delayed Project Date | 03/30/2025 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 07/15/2022 | 08/18/2022 |
| Bid Auth. Approval | 07/15/2022 | 08/18/2022 |
| Construction Approval | 07/15/2022 | 08/18/2022 |
| Project Closeout | 06/30/2025 | 06/20/2025 |
| Audit Date | 06/27/2025 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 600,000 | 600,000 |
| Other Construction | 0 | 0 |
| Total Construction | 600,000 | 600,000 |
| Total TIB Funding | 600,000 | 600,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| POULSBO | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
| Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
|---|---|---|---|---|---|
| ADA Curb Ramp Upgrades & Installation | Pedestrian | Mar 2022 | $300,000 | $300,000 | |
| The City has over 700 curb ramps identified in the ADA Transition Plan that are currently non-compliant and more than 50 locations that are missing curb ramps entirely. This project would upgrade and/or replace up to 50 non-compliant curb ramp locations within the City limits. | |||||
| Johnson Parkway | Pedestrian; Bicycle | Feb 2025 | $300,000 | $300,000 | |
| The project will construct approximately 4,400 feet of shared use path and separated sidewalk along with two 11-foot lanes, a roundabout at Johnson Parkway and SR305 intersection, a compact roundabout at Johnson Parkway and Sunrise Ridge Ave, and associated drainage. | |||||
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||