City of Anacortes's Complete Streets Award

C-W-154(002)-1

C-W-154(002)-1
Complete Streets Award

March 2022 Selection

FY 2023 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $400,000

County: Skagit   |   Legislative District: 40   |   Project Length: 0.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 06/07/2022

Project Information

Lead Agency ANACORTES
Funding Year 2023
Program CSP
Current Phase Construction
Legislative District 40
Congressional District 2
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Tim Hohmann
Contact Email timh@cityofanacortes.org
TIB Engineer Chris Langhoff
Last Payment Date 06/07/2022
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   03/30/2022
Delayed Project Date 03/30/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 05/01/2022 05/18/2022
Bid Auth. Approval 05/01/2022 05/18/2022
Construction Approval 05/01/2022 05/18/2022
Project Closeout 02/28/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 400,000 400,000
Other Construction 0 0
Total Construction 400,000 400,000
     
Total TIB Funding 400,000 400,000

Local Funding Partners

Funding Amount Percent
ANACORTES 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
2022 Sidewalk and ADA Pedestrian Mar 2022 $200,000 $ 0
Completion of existing sidewalk gaps and ADA ramp compliance at various locations around town. Areas targeted for improvement in 2022 include Hillcrest Dr. and O Avenue with connecting numbered streets. The City is committed to $300,000 worth of improvements for this project as seen on the other work plans and would account for the remaining $100,000 utilizing local funds in this scenario.
H Avenue Multimodal ACFL Pedestrian; Bicycle Mar 2022 $200,000 $ 0
Construction of a multimodal pedestrian and bicycle path along H Ave. from 41st St. south to the trailhead of Anacortes Community Forest Lands (ACFL) Trail #208. The the path is expected to be 8 feet wide and approximately 1500' long. The project will also install a missing ADA ramp on the SE Corner of the 41st & H Intersection.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments