TIB Project Information

City of Anacortes's Complete Streets Award

C-W-154(001)-1

C-W-154(001)-1
Complete Streets Award

Jan 2017 Selection

FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000

County: Skagit   |   Legislative District: 40   |   Project Length: 0.01   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 07/06/2017

Project Information

Lead Agency ANACORTES
Funding Year 2018
Program CSP
Current Phase Audit
Legislative District 40
Congressional District 2
Federal Route Number 9999
Project Length 0.01 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Eric Shjarback
Contact Email erics@cityofanacortes.org
TIB Engineer Chris Langhoff
Last Payment Date 07/06/2017
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   02/06/2017
Delayed Project Date 07/01/2019  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/06/2017
Bid Auth. Approval 02/06/2017
Construction Approval 02/15/2017 02/21/2017
Project Closeout 12/31/2017 11/08/2018
Audit Date   11/14/2018
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 250,000 250,000
Other Construction 0 0
Total Construction 250,000 250,000
     
Total TIB Funding 250,000 250,000

Local Funding Partners

Funding Amount Percent
ANACORTES 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
Sidewalk Trip Hazard Repair Pedestrian Dec 2016 $100,000 $103,000
Anacortes has several blocks of sidewalk in disrepair. We have prioritized the old town area as a focal point.
ADA Ramp Installation and Retrofit Pedestrian Dec 2016 $100,000 $100,000
Anancortes has prioritized the old town area as a focal point for ADA ramp installation and repair
Neighborhood Greenways Pedestrian; Bicycle Dec 2016 $50,000 $47,000
The Anacortes Bike/Ped plan has several corridors planned for Neighborhood Greenways. This will be a pilot project to create one or two of these greenways.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments