City of Anacortes's Complete Streets Award
C-W-154(002)-1
C-W-154(002)-1
Complete Streets Award
March 2022 Selection
FY 2023 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $400,000
County: Skagit | Legislative District: 40 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 06/07/2022
Project Information
| Lead Agency | ANACORTES |
| Funding Year | 2023 |
| Program | CSP |
| Current Phase | Audit |
| Legislative District | 40 |
| Congressional District | 2 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Tim Hohmann |
| Contact Email | timh@cityofanacortes.org |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 06/07/2022 |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 03/30/2022 | |
| Delayed Project Date | 03/30/2025 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 05/01/2022 | 05/18/2022 |
| Bid Auth. Approval | 05/01/2022 | 05/18/2022 |
| Construction Approval | 05/01/2022 | 05/18/2022 |
| Project Closeout | 02/28/2025 | 03/20/2025 |
| Audit Date | 03/27/2025 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 400,000 | 400,000 |
| Other Construction | 0 | 0 |
| Total Construction | 400,000 | 400,000 |
| Total TIB Funding | 400,000 | 400,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ANACORTES | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
| Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
|---|---|---|---|---|---|
| 2022 Sidewalk and ADA | Pedestrian | Mar 2022 | $349,371 | $349,371 | |
| Completion of existing sidewalk gaps and ADA ramp compliance at various locations around town. Areas targeted for improvement in 2022 include Hillcrest Dr. and O Avenue with connecting numbered streets. The City is committed to $300,000 worth of improvements for this project as seen on the other work plans and would account for the remaining $100,000 utilizing local funds in this scenario. | |||||
| H Avenue Multimodal ACFL | Pedestrian; Bicycle | Mar 2022 | $200,000 | $ 0 | |
| Construction of a multimodal pedestrian and bicycle path along H Ave. from 41st St. south to the trailhead of Anacortes Community Forest Lands (ACFL) Trail #208. The the path is expected to be 8 feet wide and approximately 1500' long. The project will also install a missing ADA ramp on the SE Corner of the 41st & H Intersection. | |||||
| 22nd Street Pedestrian Improvements | Pedestrian | Mar 2025 | $50,629 | $50,629 | |
| Replaced multiple ADA ramps, sidewalk, curb & gutter | |||||
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||