City of Sedro Woolley's Complete Streets Award
C-W-126(002)-1
C-W-126(002)-1
Complete Streets Award
March 2022 Selection
FY 2023 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $500,000
County: Skagit | Legislative District: 39 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 06/07/2022
Project Information
Lead Agency | SEDRO WOOLLEY |
Funding Year | 2023 |
Program | CSP |
Current Phase | Audit |
Legislative District | 39 |
Congressional District | 2 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | David Lee |
Contact Email | dlee@sedro-woolley.gov |
TIB Engineer | Chris Langhoff |
Last Payment Date | 06/07/2022 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/30/2022 | |
Delayed Project Date | 03/30/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 05/01/2022 | 04/18/2022 |
Bid Auth. Approval | 05/01/2022 | 04/18/2022 |
Construction Approval | 05/01/2022 | 04/18/2022 |
Project Closeout | 12/31/2024 | 11/20/2024 |
Audit Date | 11/20/2024 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 500,000 | 500,000 |
Other Construction | 0 | 0 |
Total Construction | 500,000 | 500,000 |
Total TIB Funding | 500,000 | 500,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SEDRO WOOLLEY | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Signalized Pedestrian Crossing | Pedestrian | Mar 2022 | $45,000 | $96,121 | |
Install a pedestrian crossing of Cook Road just east of the Prospect Road intersection to serve the Janicki Ballfield complex and playground. The crossing would be signalized using RRFBs. | |||||
New Sidewalk - State Street | Pedestrian | Mar 2022 | $225,000 | $121,797 | |
Install a sidewalk on the north side of State Street between Central Ave and the existing sidewalk in front of the Senior Center (320 LF, 5' wide with planter strip). Project woould also include 4 curb ramp installations. | |||||
Replace Sidewalk - Nelson Street | Pedestrian | Mar 2022 | $126,000 | $109,203 | |
Replace damaged sidewalk on the south side of Nelson Street between 6th & 7th Streets in the vicinity of elementary school ( 435 LF, 5' wide, separated from roadway). Work also included curb ramp installations. | |||||
ADA Curb Ramps | Pedestrian | Mar 2022 | $79,000 | $169,315 | |
Install or upgrade ADA curb ramps to eliminate barriers at various locations indentified in the City ADA Transition Plan. Per the ADA Transition Plan, a cost of $15,000 per ramp will be used. This cost includes deisgn, necessary demolition and new construction. | |||||
RRFB Installations | Pedestrian | Apr 2024 | $25,000 | $17,059 | |
Install RRFB signals at the walking trail crossing on Township Street and at the crossing on the south leg of the Township Street-Ferry |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |