Projects — TIB Project Information
TIB Project Information
City of Snoqualmie's Complete Streets Award
C-P-806(001)-1
C-P-806(001)-1
Complete Streets Award
Jan 2017 Selection
FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000
County: King | Legislative District: 5 | Project Length: 0.10 | TIB Engineer: Greg Armstrong | Last Payment Date: 07/06/2017
Project Information
Lead Agency | SNOQUALMIE |
Funding Year | 2018 |
Program | CSP |
Current Phase | Audit |
Legislative District | 5 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Brian Coleman |
Contact Email | Bcoleman@ci.snoqualmie.wa.us |
TIB Engineer | Greg Armstrong |
Last Payment Date | 07/06/2017 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 02/07/2017 | |
Delayed Project Date | 07/01/2019 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/07/2017 | |
Bid Auth. Approval | 02/15/2017 | |
Construction Approval | 03/10/2017 | 03/13/2017 |
Project Closeout | 12/31/2019 | 01/17/2019 |
Audit Date | 02/04/2020 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 250,000 | 250,000 |
Other Construction | 0 | 0 |
Total Construction | 250,000 | 250,000 |
Total TIB Funding | 250,000 | 250,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SNOQUALMIE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Ped Activated RRFB | Pedestrian | Dec 2016 | $62,000 | $ 0 | |
Add two dual-facing Rectangular Rapid Flashing Beacons(RRFB) at King Street and SR 202 | |||||
Pedestrian Fencing | Pedestrian | Dec 2016 | $70,000 | $50,238 | |
Intall 1,100 lf of four foot tall fencing adjacent to the active rail line between SE King Street and SE Northern Street | |||||
Extend Sidewalk | Pedestrian | Dec 2016 | $50,000 | $ 0 | |
Adds sidewalk adjacent to the school on the south side of Newton Street between Doone Avenue and Reinig Place SE. | |||||
Install Sidewalk | Aug 2018 | $40,000 | $38,942 | ||
Install 300 ft of 8 foot wide sidewalk from the north end of the Railroad Avenue Bridge along SR 202 to the Tokul Roundabout pedestrian crossing. | |||||
Sidewalk Repair and Replacement | Sep 2019 | $140,000 | $160,820 | ||
Reapair and replace various sections of sidewalks which have been damaged by tree roots or poor foundations and are considered hazardous to pedestrians. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |