City of Lake Stevens's 91st Avenue SE Sidewalk
C-P-146(002)-1
C-P-146(002)-1
91st Avenue SE Sidewalk
8th St SE to Market Pl
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $442,564
County: Snohomish | Legislative District: 39 | Project Length: 0.38 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | LAKE STEVENS |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 39 |
Congressional District | 1 |
Federal Route Number | 2647 |
Project Length | 0.38 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Eric Mangold |
Contact Email | emangold@lakestevenswa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 05/13/2024 | |
Delayed Project Date | 05/13/2027 | |
DAHP Assessment Date | 05/14/2024 | |
Predesign Approval | ||
Design Approval | 06/15/2024 | 05/31/2024 |
Bid Auth. Approval | 06/15/2024 | 05/31/2024 |
Construction Approval | 07/10/2024 | 07/10/2024 |
Project Closeout | 11/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 78,796 |
Construction Contract | 450,000 | 1,269,011 |
Other Construction | 0 | 0 |
Total Construction | 450,000 | 1,347,807 |
Funding Surplus | - 7,436 | |
Total TIB Funding | 442,564 | 1,347,807 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
LAKE STEVENS | 905,243 | 67.2% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 905,243 | 67.2% |
Project Description
This project will construct a continuous non-motorized, shared-use, pedestrian/bicycle pathway along the east side of 91st Ave SE, between the intersections at 8th St SE and at Market Place (Figures 1 and 2). When possible, this project will link existing, disconnected sidewalks into the continuous pathway and add approximately 2,000 lineal feet of new pathway to complete the 3,300 lineal foot corridor. The project will improve safe multi-modal use and ADA-compliant accessibility through driveway ramps, crosswalk and similar striping, and new and/or improved pedestrian crossing ramps compliant with the new 2023 edition of the PROWAG. Where possible, the project will include landscaping strips within available right-of-way. This project will connect nearby neighborhoods with Hillcrest Elementary, Skyline Elementary, and Lake Stevens Middle School provide increased transit stop access and contribute to an overall goal to provide a continuous connection along 91st Ave southto 20th St SE.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |