Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Edmonds's Complete Streets Award

C-P-139(001)-1

C-P-139(001)-1
Complete Streets Award

Jan 2017 Selection

FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000

County: Snohomish   |   Legislative District: 21   |   Project Length: 0.01   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 07/06/2017

Project Information

Lead Agency EDMONDS
Funding Year 2018
Program CSP
Current Phase Audit
Legislative District 21
Congressional District 7
Federal Route Number 9999
Project Length 0.01 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Hague, Ryan
Contact Email Ryan.Hague@edmondswa.gov
TIB Engineer Greg Armstrong
Last Payment Date 07/06/2017
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   02/06/2017
Delayed Project Date 07/01/2019  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/06/2017
Bid Auth. Approval 02/06/2017
Construction Approval 05/20/2017 06/08/2017
Project Closeout 10/31/2018 07/03/2018
Audit Date   07/16/2018
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 250,000 250,000
Other Construction 0 0
Total Construction 250,000 250,000
     
Total TIB Funding 250,000 250,000

Local Funding Partners

Funding Amount Percent
EDMONDS 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
Dayton Street Sidewalk enhancements Pedestrian Dec 2016 $250,000 $ 0
Complete sidewalk enhnacements along Dayton Street between 3rd Avenue and 9th Avenue. Enhancements include replacement of failing sidewalk sections, removal of obstructions, ADA ramp upgrades and completes a short missing sidewalk link.
Sidewalk enhancement along 238th Street SE between
SR 99 and SR 104
Pedestrian Jan 2018 $250,000 $250,000
This project will widen the 1000 linear foot of proposed sidewalk on the north side of 238th St. SW between SR 104 and SR 99 from 5' to 7, and complete pedestrian improvements to the existing island on the west side of the project limits (SR 104 @ 238th Sr. SW)

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments