Projects — TIB Project Information
TIB Project Information
City of Fircrest's Electron Way
C-P-130(001)-1
C-P-130(001)-1
Electron Way
Constra Costa Ave Intersection
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $75,724
County: Pierce | Legislative District: 28 | Project Length: 0.10 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | FIRCREST |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 28 |
Congressional District | 10 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Tyler Bemis |
Contact Email | tbemis@cityoffircrest.net |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 05/13/2024 | |
Delayed Project Date | 05/13/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 06/15/2024 | 06/27/2024 |
Bid Auth. Approval | 09/24/2024 | 09/25/2024 |
Construction Approval | 10/15/2024 | 11/04/2024 |
Project Closeout | 01/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 10,773 |
Right of Way | 0 | 0 |
Total Design | 0 | 10,773 |
Construction Engineering | 6,000 | 18,473 |
Construction Contract | 59,847 | 139,600 |
Other Construction | 0 | 0 |
Total Construction | 65,847 | 158,073 |
Funding Increase | 9,877 | |
Total TIB Funding | 75,724 | 168,846 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
FIRCREST | 13,369 | 7.9% |
WSDOT Funding | 0 | 0.0% |
Department of Commerce | 79,753 | 47.2% |
Total Local Funding | 93,122 | 55.1% |
Project Description
The project will provide curb, gutter, and ADA-compliant ramps, and tie into existing facilities at the north approach crossing from Contra Costa Ave (E-W) and the west approach crossing of Electron Way (N-S). The project will replace very dated and out-of-compliance curb ramps to serve people of all ages and abilities with accessible crossing locations. These improvements provide a direct connection to nonÂmotorized improvements funded by legislative capital appropriations to install new curb ramps serving the south approach crossing from Contra Costa Ave (E-W) and the east approach crossing of Electron Way (N-S), with an RRFB to improve pedestrian safety. The legislative funding only replaces half of the out-of-compliant curb ramps, which makes it difficult to tie into new facilities with existing facilities while meeting ADA standards.
Existing Condition
Project Benefits
- The existing intersection of Electron Way and Contra Costa Avenue is unsignalized and has sub-standard ADA ramps.
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |