Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Fircrest's Electron Way

C-P-130(001)-1

C-P-130(001)-1
Electron Way

Constra Costa Ave Intersection

FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $75,724

County: Pierce   |   Legislative District: 28   |   Project Length: 0.10   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency FIRCREST
Funding Year 2026
Program CSP
Current Phase Construction
Legislative District 28
Congressional District 10
Federal Route Number 9999
Project Length 0.10 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Tyler Bemis
Contact Email tbemis@cityoffircrest.net
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   05/13/2024
Delayed Project Date 05/13/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 06/15/2024 06/27/2024
Bid Auth. Approval 09/24/2024 09/25/2024
Construction Approval 10/15/2024 11/04/2024
Project Closeout 01/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 10,773
Right of Way 0 0
Total Design 0 10,773
     
Construction Engineering 6,000 18,473
Construction Contract 59,847 139,600
Other Construction 0 0
Total Construction 65,847 158,073
     
Funding Increase 9,877  
Total TIB Funding 75,724 168,846

Local Funding Partners

Funding Amount Percent
FIRCREST 13,369 7.9%
WSDOT Funding 0 0.0%
Department of Commerce  79,753 47.2%
 
 
 
 
 
 
 
Total Local Funding 93,122 55.1%

Project Description

The project will provide curb, gutter, and ADA-compliant ramps, and tie into existing facilities at the north approach crossing from Contra Costa Ave (E-W) and the west approach crossing of Electron Way (N-S). The project will replace very dated and out-of-compliance curb ramps to serve people of all ages and abilities with accessible crossing locations. These improvements provide a direct connection to non­motorized improvements funded by legislative capital appropriations to install new curb ramps serving the south approach crossing from Contra Costa Ave (E-W) and the east approach crossing of Electron Way (N-S), with an RRFB to improve pedestrian safety. The legislative funding only replaces half of the out-of-compliant curb ramps, which makes it difficult to tie into new facilities with existing facilities while meeting ADA standards.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.