City of Fircrest's Electron Way
C-P-130(001)-1
C-P-130(001)-1
Electron Way
Constra Costa Ave Intersection
FY 2026 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $70,587
County: Pierce | Legislative District: 28 | Project Length: 0.10 | TIB Engineer: Greg Armstrong | Last Payment Date: 04/01/2025
Project Information
| Lead Agency | FIRCREST |
| Funding Year | 2026 |
| Program | CSP |
| Current Phase | Audit |
| Legislative District | 28 |
| Congressional District | 10 |
| Federal Route Number | 9999 |
| Project Length | 0.10 mi. |
| ADT | 0 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Tyler Bemis |
| Contact Email | tbemis@cityoffircrest.net |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | 04/01/2025 |
| Cultural Resource Assessment |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 05/13/2024 | |
| Delayed Project Date | 05/13/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 06/15/2024 | 06/27/2024 |
| Bid Auth. Approval | 09/24/2024 | 09/25/2024 |
| Construction Approval | 10/15/2024 | 11/04/2024 |
| Project Closeout | 03/31/2025 | 03/27/2025 |
| Audit Date | 04/01/2025 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 6,000 | 25,844 |
| Construction Contract | 59,847 | 129,218 |
| Other Construction | 0 | 0 |
| Total Construction | 65,847 | 155,062 |
| Funding Increase | 9,877 | |
| Funding Surplus | - 5,137 | |
| Total TIB Funding | 70,587 | 155,062 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| FIRCREST | 4,722 | 3.0% |
| WSDOT Funding | 0 | 0.0% |
| Department of Commerce | 79,753 | 47.2% |
| Total Local Funding | 84,475 | 50.2% |
Project Description
The project will provide curb, gutter, and ADA-compliant ramps, and tie into existing facilities at the north approach crossing from Contra Costa Ave (E-W) and the west approach crossing of Electron Way (N-S). The project will replace very dated and out-of-compliance curb ramps to serve people of all ages and abilities with accessible crossing locations. These improvements provide a direct connection to nonÂmotorized improvements funded by legislative capital appropriations to install new curb ramps serving the south approach crossing from Contra Costa Ave (E-W) and the east approach crossing of Electron Way (N-S), with an RRFB to improve pedestrian safety. The legislative funding only replaces half of the out-of-compliant curb ramps, which makes it difficult to tie into new facilities with existing facilities while meeting ADA standards.
Existing Condition
Project Benefits
- The existing intersection of Electron Way and Contra Costa Avenue is unsignalized and has sub-standard ADA ramps.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||