City of Tacoma's McKinley overlook complete streets
C-P-128(003)-1
C-P-128(003)-1
McKinley overlook complete streets
East E Street to East F Street
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $469,532
County: Pierce | Legislative District: 29 | Project Length: 0.25 | TIB Engineer: Greg Armstrong | Last Payment Date: 10/01/2024
Project Information
Lead Agency | TACOMA |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 29 |
Congressional District | 10 |
Federal Route Number | 9999 |
Project Length | 0.25 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Clara Dubow |
Contact Email | cdubow@cityoftacoma.org |
TIB Engineer | Greg Armstrong |
Last Payment Date | 10/01/2024 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/22/2024 | |
Delayed Project Date | 03/22/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 03/22/2024 | 03/28/2024 |
Bid Auth. Approval | 04/30/2024 | 04/24/2024 |
Construction Approval | 05/21/2024 | 05/30/2024 |
Project Closeout | 02/28/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 62,530 | 45,894 |
Right of Way | 0 | 0 |
Total Design | 62,530 | 45,894 |
Construction Engineering | 62,530 | 87,787 |
Construction Contract | 255,509 | 583,329 |
Other Construction | 27,720 | 5,073 |
Total Construction | 345,759 | 676,189 |
Funding Increase | 61,243 | |
Total TIB Funding | 469,532 | 722,083 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TACOMA | 252,551 | 35.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 252,551 | 35.0% |
Project Description
This project will be reducing the existing roadway width to provide a sidewalk with planters, illumination, and various amenities and artwork. ADA-compliant curb ramps and parking has also been incorporated. The Overlook is at a very high vantage point, and this sidewalk connects the Overlook to a stairway that leads down to the bottom of the hill, where it ties into a complete-streets corridor. This connecting street, East McKinley Way, provides direct access to the neighborhood businesses to the south, promoting community involvement and creating a cohesive plan for future connections to the west and the overall business district of the McKinley neighborhood. East McKinley Way also provides access to the Dome district to the west, which is frequented by people looking to use the main transit hub as well as attend events at the Tacoma Dome and Freighthouse Square.
Existing Condition
Project Benefits
- The existing street is wide and not attractive or safe for pedestrians.
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |