East E Street to East F Street

FY 2026 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $461,814

County: Pierce   |   Legislative District: 29   |   Project Length: 0.25   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 03/19/2025

Project Information

Lead Agency TACOMA
Funding Year 2026
Program CSP
Current Phase Audit
Legislative District 29
Congressional District 10
Federal Route Number 9999
Project Length 0.25 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Clara Dubow
Contact Email cdubow@cityoftacoma.org
TIB Engineer Greg Armstrong
Last Payment Date 03/19/2025
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   03/22/2024
Delayed Project Date 03/22/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 03/22/2024 03/28/2024
Bid Auth. Approval 04/30/2024 04/24/2024
Construction Approval 05/21/2024 05/30/2024
Project Closeout 03/31/2025 03/26/2025
Audit Date   03/19/2025
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 62,530 51,644
Right of Way 0 0
Total Design 62,530 51,644
     
Construction Engineering 62,530 93,670
Construction Contract 255,509 463,389
Other Construction 27,720 0
Total Construction 345,759 557,059
     
Funding Increase 61,243  
Funding Surplus - 7,718  
Total TIB Funding 461,814 608,703

Local Funding Partners

Funding Amount Percent
TACOMA 146,889 24.1%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 146,889 24.1%

Project Description

This project will be reducing the existing roadway width to provide a sidewalk with planters, illumination, and various amenities and artwork. ADA-compliant curb ramps and parking has also been incorporated. The Overlook is at a very high vantage point, and this sidewalk connects the Overlook to a stairway that leads down to the bottom of the hill, where it ties into a complete-streets corridor. This connecting street, East McKinley Way, provides direct access to the neighborhood businesses to the south, promoting community involvement and creating a cohesive plan for future connections to the west and the overall business district of the McKinley neighborhood. East McKinley Way also provides access to the Dome district to the west, which is frequented by people looking to use the main transit hub as well as attend events at the Tacoma Dome and Freighthouse Square.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments