City of Federal Way's SR 99 pedestrian improvements

C-P-113(002)-1

C-P-113(002)-1
SR 99 pedestrian improvements

S 304th Street to S 308th Street

FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $120,800

County: King   |   Legislative District: 30   |   Project Length: 0.10   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 09/13/2024

Project Information

Lead Agency FEDERAL WAY
Funding Year 2026
Program CSP
Current Phase Construction
Legislative District 30
Congressional District 8
Federal Route Number 0099
Project Length 0.10 mi.
ADT 0
Functional Class Principal
Type of Work Pedestrian
Project Contact Rick Perez,
Contact Email rick.perez@cityoffederalway.com
TIB Engineer Greg Armstrong
Last Payment Date 09/13/2024
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   03/22/2024
Delayed Project Date 03/22/2027  
DAHP Assessment Date   07/25/2024
Predesign Approval
Design Approval 04/10/2024 04/22/2024
Bid Auth. Approval 07/15/2024 07/23/2024
Construction Approval 08/10/2024 08/08/2024
Project Closeout 12/31/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 4,000 15,000
Right of Way 0 0
Total Design 4,000 15,000
     
Construction Engineering 4,000 15,000
Construction Contract 112,800 121,000
Other Construction 0 0
Total Construction 116,800 136,000
     
Total TIB Funding 120,800 151,000

Local Funding Partners

Funding Amount Percent
FEDERAL WAY 30,200 20.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 30,200 20.0%

Project Description

The project would attempt to make improvements to pedestrian mobility through improved streetlighting, median fencing to encourage crossing at interesections, and reducing speeds during school ingress and egress periods along Pacific Highway S between S 304th Street and S 308th Street via a 30 MPH advisory school speed zone. Additionally, the City will replace luminaire heads at the intersection of S 308 St and SR 99, as well as the 1st one on each side of the intersection and each side of SR 99 away from the intersection (8 total) with higher wattage LEDs to improve pedestrian visability. Red Light Indicator lights will also be installed on the signal heads at both intersections within this corridor to provide easier way for police to enforce red-light running. As soon as weather permits, the City will also refresh all crosswalk markings and stop lines at S 308 St and SR 99. There are no proposed changes to channelization so it is anticipated that WSDOT's concurrence is not required.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.