Projects — TIB Project Information
TIB Project Information
City of Kent's 132nd Avenue SE multi-use path
C-P-106(004)-1
C-P-106(004)-1
132nd Avenue SE multi-use path
SE 228th Place to SE 240th Street
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $471,601
County: King | Legislative District: 47 | Project Length: 1.00 | TIB Engineer: Greg Armstrong | Last Payment Date: 09/17/2024
Project Information
Lead Agency | KENT |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 47 |
Congressional District | 8, 9 |
Federal Route Number | 1099 |
Project Length | 1.00 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | Pedestrian |
Project Contact | David Paine |
Contact Email | dpaine@kentwa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | 09/17/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/22/2024 | |
Delayed Project Date | 03/22/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 04/15/2022 | 04/15/2024 |
Bid Auth. Approval | 04/15/2024 | 04/15/2024 |
Construction Approval | 04/15/2024 | 04/15/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 65,527 | 160,392 |
Construction Contract | 434,473 | 1,494,926 |
Other Construction | 0 | 0 |
Total Construction | 500,000 | 1,655,318 |
Funding Surplus | - 28,399 | |
Total TIB Funding | 471,601 | 1,655,318 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KENT | 1,183,717 | 71.5% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 1,183,717 | 71.5% |
Project Description
The project improves walkways on the west side of the street with more comfortable space for walkers bicycists and rollers, completing the link to the sidewalk network at both ends. The project adds a paved walkway on the east side south of SE 233rd Street to connect the Wildwood Estates neighborhood to the marked crossing at SE 234th St. A vertical barrier between the walkway and travel lanes will be installed on both sides.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |