March 2022 Selection

FY 2023 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $350,000

County: Kittitas   |   Legislative District: 13   |   Project Length: 0.43   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 06/07/2022

Project Information

Lead Agency CLE ELUM
Funding Year 2023
Program CSP
Current Phase Construction
Legislative District 13
Congressional District 8
Federal Route Number P190
Project Length 0.43 mi.
ADT 0
Functional Class Principal
Type of Work Reconstruction
Project Contact Rob Omans
Contact Email romans@cleelum.gov
TIB Engineer Jonathan Heusman
Last Payment Date 06/07/2022
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   03/28/2022
Delayed Project Date 03/28/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 04/30/2022 04/11/2022
Bid Auth. Approval 04/30/2022 04/11/2022
Construction Approval 04/30/2022 04/11/2022
Project Closeout 12/31/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 350,000 350,000
Other Construction 0 0
Total Construction 350,000 350,000
     
Total TIB Funding 350,000 350,000

Local Funding Partners

Funding Amount Percent
CLE ELUM 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
First Street Downtown Revitalization Phases 3A and 3B Pedestrian; Aesthetics Mar 2022 $350,000 $306,000
The combined First Street Downtown Revitalization Phases 3A and 3B project will include improvements on the south side of First Street between Billings Avenue and Oakes Avenue, intersection improvements to the northwest, southwest and northeast corners of the First Street and Oakes Avenue intersection, improvements on the north side of First Street between Oakes Avenue and Pennsylvania Avenue, improvements on the north side of First Street between Pennsylvania Avnue and Harris Avenue, and intersection improvements to the northwest corner of the First Street and Harris Avenue intersection. Improvements include new bulbouts, 30-degree angled parking, pavement markings with reduced lane widths, street signage with decorative pole provisions, curb and gutter, wide sidewalks with scoring patterns, ADA curb ramps, pedestrian and street illumination, hangining basket brackets, undergrounding utilities, planters with trees and shrubs based on adopted landscape and urban design treatmentes, irrigation system, and site furnishings, including benches, bike racks, relocating existing coal carts, and trash recepticals.
Safe Streets and Roads for All - Safety Action Plan
and Program Action Plan
Planning Mar 2024 $44,000 $ 0
The City will be developing a Safety Action Plan and complete an American Disability Act (ADA) Self Evaluation and Program Access Plan. The City received a Safe Streets and Roads for All (SS4A) grant award for this effort, which includes a 20% match requirement by the City. The Complete Streets award will serve as the City's match. The Safety Action Plan will prepare strategy to eliminate roadway fatalities and serious injury. The ADA Self Evaluation and Program Access Plan will assess existing public infrastructure for compliance with ADA standards, and identify future programs and projects necessary for ADA compliance.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments