 Projects — TIB Project Information

TIB Project Information

City of Cle Elum's Complete Streets Award

C-E-930(001)-1

C-E-930(001)-1
Complete Streets Award

Jan 2017 Selection

FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $125,000

County: Kittitas   |   Legislative District: 13   |   Project Length: 0.10   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 02/27/2017

Project Information

Lead Agency CLE ELUM
Funding Year 2018
Program CSP
Current Phase Audit
Legislative District 13
Congressional District 8
Federal Route Number 9999
Project Length 0.10 mi.
ADT 0
Functional Class Principal
Type of Work Pedestrian
Project Contact Rob Omans
Contact Email robert@cityofcleelum.com
TIB Engineer Jonathan Heusman
Last Payment Date 02/27/2017
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   01/06/2017
Delayed Project Date 07/01/2019  
DAHP Assessment Date  
Predesign Approval
Design Approval
Bid Auth. Approval
Construction Approval 02/15/2017 02/22/2017
Project Closeout 12/31/2018 11/13/2018
Audit Date   11/14/2018
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 125,000 125,000
Other Construction 0 0
Total Construction 125,000 125,000
     
Total TIB Funding 125,000 125,000

Local Funding Partners

Funding Amount Percent
CLE ELUM 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
SR 903 & Peoh Ave. Pedestrian Crossing Safety Project Pedestrian; Aesthetics Jan 2017 $102,000 $100,494
This location is at the start of the buisiness district and will also help slow vehicles down before entering a busy pedestrian area. The project at this interesction will include design, construcion of bulbouts, curb and gutters, sidewalks, ADA ramps and storm drainage provisions. The project will also include landscaping and some street aesthetics as it is the entrance to our business district..
SR 903 and Denny Avenue Pedestrian Crosswalk Signage Pedestrian; Bicycle Jan 2017 $8,000 $9,506
Install Rectangular Rapid Flashing Beacon (RRFB) pedestrian crossing signs with push buttons at existing crosswalk at SR 903 and Denny Avenue.
Pedestrian and Bicycle Plan Planning Jan 2017 $15,000 $15,000
Preparation of a Pedestrian and Bicycle Plan including inventory of existing facilities, and identifying network deficiencies and proposed improvements.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.