City of Leavenworth's Complete Streets Award

C-E-850(001)-1

C-E-850(001)-1
Complete Streets Award

Jan 2017 Selection

FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000

County: Chelan   |   Legislative District: 12   |   Project Length: 0.10   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 02/27/2017

Project Information

Lead Agency LEAVENWORTH
Funding Year 2018
Program CSP
Current Phase Audit
Legislative District 12
Congressional District 8
Federal Route Number B042
Project Length 0.10 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Joel Walinski
Contact Email jwalinski@cityofleavenworth.com
TIB Engineer Andrew Beagle
Last Payment Date 02/27/2017
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   01/27/2017
Delayed Project Date 07/01/2019  
DAHP Assessment Date  
Predesign Approval
Design Approval
Bid Auth. Approval
Construction Approval 03/01/2017 02/22/2017
Project Closeout 12/31/2019 01/06/2020
Audit Date   02/04/2020
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 250,000 250,000
Other Construction 0 0
Total Construction 250,000 250,000
     
Total TIB Funding 250,000 250,000

Local Funding Partners

Funding Amount Percent
LEAVENWORTH 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
Multi-use Pathway Bicycle Feb 2017 $33,161 $ 0
Addition of a 10 Ft. wide multi-use pathway on the north side of Pine Street from Central to Titus extending the pathway constructed in 2016, approximately 1,300 feet.
Sidewalk Pedestrian Feb 2017 $183,839 $ 0
Addition of 5 FT, wide sidewalks on south side of Pine Street from Ski Hill Road to Titus Road, approximately 2,600 linear feet.
Crosswalks Pedestrian; Bicycle Feb 2017 $25,500 $ 0
Improve Crosswalk at one intersection on Pine Street between Ski Hill Drive and Titus Road to include Rapid Flashers and enhanced Pedestrian Crossing signage.
ADA Transition Compliance Pedestrian Feb 2017 $7,500 $ 0
Addition of ADA Transition strips to sidewalks on Pine Street Intersections.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.