Projects — TIB Project Information
TIB Project Information
City of Sunnyside's Citywide pedestrian improvements
C-E-179(001)-1
C-E-179(001)-1
Citywide pedestrian improvements
Multiple Locations
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $514,227
County: Yakima | Legislative District: 15 | Project Length: 1.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/25/2024
Project Information
Lead Agency | SUNNYSIDE |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 15 |
Congressional District | 5 |
Federal Route Number | |
Project Length | 1.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Raul Sanchez |
Contact Email | rsanchez@sunnyside-wa.gov |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/25/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/22/2024 | |
Delayed Project Date | 03/22/2027 | |
DAHP Assessment Date | 06/20/2024 | |
Predesign Approval | ||
Design Approval | 03/22/2024 | 04/16/2024 |
Bid Auth. Approval | 06/05/2024 | 06/18/2024 |
Construction Approval | 07/22/2024 | 07/24/2024 |
Project Closeout | 11/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 53,845 | 63,050 |
Right of Way | 0 | 0 |
Total Design | 53,845 | 63,050 |
Construction Engineering | 61,540 | 72,050 |
Construction Contract | 384,615 | 479,872 |
Other Construction | 0 | 0 |
Total Construction | 446,155 | 551,922 |
Funding Increase | 14,227 | |
Total TIB Funding | 514,227 | 614,972 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SUNNYSIDE | 100,745 | 16.4% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 100,745 | 16.4% |
Project Description
The project will replace non compliant ADA ramps and cross walks focusing on access routes to several schools. This project will replace 44 non-compliant ADA ramps and replace and/or install 22 cross walks. This work is consistent with the City's Complete Streets Policy, adding pedestrian mobility and safety to each of the City's schools.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |