These two locations have a high number of uncontrolled pedestrian crossings between businesses, schools, and bus stops.
Projects — TIB Project Information
TIB Project Information
City of Kennewick's Pedestrian Safety Improvements
C-E-173(003)-1
C-E-173(003)-1
Pedestrian Safety Improvements
Multiple Locations
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $204,276
County: Benton | Legislative District: 8 | Project Length: 0.01 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | KENNEWICK |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 8 |
Congressional District | 4 |
Federal Route Number | |
Project Length | 0.01 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Heath Mellotte |
Contact Email | heath.mellotte@ci.kennewick.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 05/17/2024 | |
Delayed Project Date | 05/17/2027 | |
DAHP Assessment Date | 06/14/2024 | |
Predesign Approval | ||
Design Approval | 05/31/2024 | 06/20/2024 |
Bid Auth. Approval | 07/14/2024 | 07/16/2024 |
Construction Approval | 08/19/2024 | 08/09/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 17,600 | 23,014 |
Construction Contract | 190,720 | 232,331 |
Other Construction | 0 | 0 |
Total Construction | 208,320 | 255,345 |
Funding Surplus | - 4,044 | |
Total TIB Funding | 204,276 | 255,345 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KENNEWICK | 51,069 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 51,069 | 20.0% |
Project Description
Install new ADA ramps and Rectangular Rapid Flashing Beacons (RRFBs) at W. Clearwater Ave/N Johnson St and S. Olympia St/W 36th Ave intersections where no crossings currently exist.
Existing Condition
Project Benefits
- The intersections of W Clearwater Ave @ N Johnson St and S Olympia St @ W 36th Ave are unsignalized with non-compliant ADA ramps.
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |