Projects — TIB Project Information
TIB Project Information
City of Kennewick's Citywide ADA Improvements
C-E-173(002)-1
C-E-173(002)-1
Citywide ADA Improvements
Multiple Locations
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $327,790
County: Benton | Legislative District: 8 | Project Length: 1.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 10/03/2024
Project Information
Lead Agency | KENNEWICK |
Funding Year | 2026 |
Program | CSP |
Current Phase | Construction |
Legislative District | 8 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 1.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Heath Mellotte |
Contact Email | heath.mellotte@ci.kennewick.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 10/03/2024 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/22/2024 | |
Delayed Project Date | 03/22/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 03/22/2024 | 04/03/2024 |
Bid Auth. Approval | 04/14/2024 | 04/04/2024 |
Construction Approval | 04/30/2024 | 05/03/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 8,100 |
Construction Contract | 327,790 | 401,645 |
Other Construction | 0 | 0 |
Total Construction | 327,790 | 409,745 |
Total TIB Funding | 327,790 | 409,745 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KENNEWICK | 81,955 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 81,955 | 20.0% |
Project Description
Replace and/or upgrade ADA ramps and crossings on Grandridge Blvd., Clearwater, Canal Drive, W. 10th Ave, and Creekstone. Will replace or upgrade 43 ramps with truncated domes and correct slopes and/or bypasses. Additionally, push buttons and signalized intersections may need to be modified to bring up to ADA standards. Project will be bid out with the City's annual overlay project.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |