TIB Project Information

City of West Richland's Complete Streets Award

C-E-172(001)-1

C-E-172(001)-1
Complete Streets Award

Jan 2017 Selection

FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000

County: Benton   |   Legislative District: 8   |   Project Length: 0.10   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 07/19/2017

Project Information

Lead Agency WEST RICHLAND
Funding Year 2018
Program CSP
Current Phase Audit
Legislative District 8
Congressional District 4
Federal Route Number 9999
Project Length 0.10 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Roscoe C. Slade III, P.E.
Contact Email roscoe@westrichland.org
TIB Engineer Jonathan Heusman
Last Payment Date 07/19/2017
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   02/07/2017
Delayed Project Date 07/01/2019  
DAHP Assessment Date  
Predesign Approval 12/21/2016
Design Approval 02/15/2017
Bid Auth. Approval 02/15/2017
Construction Approval 02/15/2017 02/27/2017
Project Closeout 03/01/2020 11/06/2019
Audit Date   11/18/2019
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 250,000 250,000
Other Construction 0 0
Total Construction 250,000 250,000
     
Total TIB Funding 250,000 250,000

Local Funding Partners

Funding Amount Percent
WEST RICHLAND 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
Paradise Way - Street Aesthetics Aesthetics Dec 2016 $100,000 $ 0
Remove existing approx. 1500 LF of earth berm and arborvitae landscaping. Replace w/ new irrigation system, streetscape trees and landscape rock.
ADA Ramp modifications - Pedestrian Facilities Pedestrian Dec 2016 $50,000 $ 0
Modify approximately 20 handicap ramps to meet current ADA requirements on N. 62nd Ave, Paradise Way, Harrington Drive and Grosscup Blvd.
Keene Road Pathway Repairs - Pedestrian and Bicycle
Facilities
Pedestrian; Bicycle Dec 2016 $44,283 $44,283
Remove and replace approx. 200 LF section of 12' wide asphalt pathway damaged by tree roots. Scope includes installing root barrier.
Bombing Range Road Crosswalk Improvements @ Sports
Complex - Pedestrian Facilities
Pedestrian Dec 2016 $10,000 $ 0
Install flashing crosswalk signal
School Zone Flashing Light Modifications - Pedestrian
Facilities
Pedestrian Dec 2016 $40,684 $40,684
Install flashing school zone light on Belmont Blvd for new Libby Middle School. Upgrade three existing school zone flashing light systems to be able to control and program them remotely.
Keene Road - Street Aesthetics Aesthetics Dec 2016 $45,000 $ 0
Install landscaping rock between asphalt pathway and edge of roadway between Bombing Range Road and S. Highlands Blvd. Also extend electrical power to center of roundabout at Keene Road/Bombing Range Road
ADA Ramp modifications- Pedestrian Facilities Pedestrian Apr 2019 $75,000 $75,000
Modify approximately 20 handicap ramps to meet current ADA requirements on N. 62nd Ave and Grosscup Blvd.
RRFB Flashing Crosswalk Signals Pedestrian Apr 2019 $62,000 $62,000
Install RRFB Flashing Crosswalk Signals on Bombing Range Road @ Sports Complex, on Belmont Blvd@ Belmont Elementary__, on Paradise Way @ Jade Street and
School Zone Flashing Light Pedestrian Apr 2019 $28,033 $28,033
Install flashing school zone light on Belmont Blvd and Sunshine Avenue for new Belmont Elementary School.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments