Projects — TIB Project Information
TIB Project Information
City of West Richland's Complete Streets Award
C-E-172(001)-1
C-E-172(001)-1
Complete Streets Award
Jan 2017 Selection
FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000
County: Benton | Legislative District: 8 | Project Length: 0.10 | TIB Engineer: Jonathan Heusman | Last Payment Date: 07/19/2017
Project Information
Lead Agency | WEST RICHLAND |
Funding Year | 2018 |
Program | CSP |
Current Phase | Audit |
Legislative District | 8 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Roscoe C. Slade III, P.E. |
Contact Email | roscoe@westrichland.org |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 07/19/2017 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 02/07/2017 | |
Delayed Project Date | 07/01/2019 | |
DAHP Assessment Date | ||
Predesign Approval | 12/21/2016 | |
Design Approval | 02/15/2017 | |
Bid Auth. Approval | 02/15/2017 | |
Construction Approval | 02/15/2017 | 02/27/2017 |
Project Closeout | 03/01/2020 | 11/06/2019 |
Audit Date | 11/18/2019 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 250,000 | 250,000 |
Other Construction | 0 | 0 |
Total Construction | 250,000 | 250,000 |
Total TIB Funding | 250,000 | 250,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WEST RICHLAND | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Paradise Way - Street Aesthetics | Aesthetics | Dec 2016 | $100,000 | $ 0 | |
Remove existing approx. 1500 LF of earth berm and arborvitae landscaping. Replace w/ new irrigation system, streetscape trees and landscape rock. | |||||
ADA Ramp modifications - Pedestrian Facilities | Pedestrian | Dec 2016 | $50,000 | $ 0 | |
Modify approximately 20 handicap ramps to meet current ADA requirements on N. 62nd Ave, Paradise Way, Harrington Drive and Grosscup Blvd. | |||||
Keene Road Pathway Repairs - Pedestrian and Bicycle Facilities |
Pedestrian; Bicycle | Dec 2016 | $44,283 | $44,283 | |
Remove and replace approx. 200 LF section of 12' wide asphalt pathway damaged by tree roots. Scope includes installing root barrier. | |||||
Bombing Range Road Crosswalk Improvements @ Sports Complex - Pedestrian Facilities |
Pedestrian | Dec 2016 | $10,000 | $ 0 | |
Install flashing crosswalk signal | |||||
School Zone Flashing Light Modifications - Pedestrian Facilities |
Pedestrian | Dec 2016 | $40,684 | $40,684 | |
Install flashing school zone light on Belmont Blvd for new Libby Middle School. Upgrade three existing school zone flashing light systems to be able to control and program them remotely. | |||||
Keene Road - Street Aesthetics | Aesthetics | Dec 2016 | $45,000 | $ 0 | |
Install landscaping rock between asphalt pathway and edge of roadway between Bombing Range Road and S. Highlands Blvd. Also extend electrical power to center of roundabout at Keene Road/Bombing Range Road | |||||
ADA Ramp modifications- Pedestrian Facilities | Pedestrian | Apr 2019 | $75,000 | $75,000 | |
Modify approximately 20 handicap ramps to meet current ADA requirements on N. 62nd Ave and Grosscup Blvd. | |||||
RRFB Flashing Crosswalk Signals | Pedestrian | Apr 2019 | $62,000 | $62,000 | |
Install RRFB Flashing Crosswalk Signals on Bombing Range Road @ Sports Complex, on Belmont Blvd@ Belmont Elementary__, on Paradise Way @ Jade Street and | |||||
School Zone Flashing Light | Pedestrian | Apr 2019 | $28,033 | $28,033 | |
Install flashing school zone light on Belmont Blvd and Sunshine Avenue for new Belmont Elementary School. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |