Projects — TIB Project Information
TIB Project Information
City of Richland's Complete Streets Award
C-E-171(001)-1
C-E-171(001)-1
Complete Streets Award
March 2022 Selection
FY 2023 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $450,000
County: Benton | Legislative District: 8 | Project Length: 0.30 | TIB Engineer: Jonathan Heusman | Last Payment Date: 06/07/2022
Project Information
Lead Agency | RICHLAND |
Funding Year | 2023 |
Program | CSP |
Current Phase | Construction |
Legislative District | 8 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.30 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Carlo D'Alissandro |
Contact Email | cdalessandro@ci.richland.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 06/07/2022 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/25/2022 | |
Delayed Project Date | 03/25/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 04/30/2022 | 05/04/2022 |
Bid Auth. Approval | 04/30/2022 | 05/04/2022 |
Construction Approval | 04/30/2022 | 05/04/2022 |
Project Closeout | 12/15/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 450,000 | 450,000 |
Other Construction | 0 | 0 |
Total Construction | 450,000 | 450,000 |
Total TIB Funding | 450,000 | 450,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
RICHLAND | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Sidewalk Connectivity Improvements | Pedestrian | Mar 2022 | $250,000 | $250,000 | |
Design and construct approx. 1300 ft of sidewalk on Gala Way (irrigation canal to Hunter, McMurray St (Forest to Mahan), and Humphreys St (Wright to Winslow) and plus additional sidewalk on various routes (as indicated on City Sidewalk Route Infill List). Associated ADA curg ramps, curb and gutter will also be addressed. City will utilize Sidewalk Route Infill List to prioritize as ROW community acceptance and funding allows. | |||||
Pedestrian Crossing Improvements | Pedestrian | Mar 2022 | $150,000 | $150,000 | |
Design and construct RRFB for crosswalks at various locations (as indicated on City RRFB Ranking Matrix). Associated signs, pavement markings, ADA curb ramps, curb and gutter will also be addressed. City will utilize RRFB Ranking Matrix to prioritize as ROW, community acceptance and funding allows. | |||||
Speed Study | Planning | Mar 2022 | $50,000 | $50,000 | |
Perform a speed study of city streets with injury minimization approach. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |