Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Richland's Complete Streets Award

C-E-171(001)-1

C-E-171(001)-1
Complete Streets Award

March 2022 Selection

FY 2023 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $450,000

County: Benton   |   Legislative District: 8   |   Project Length: 0.30   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 06/07/2022

Project Information

Lead Agency RICHLAND
Funding Year 2023
Program CSP
Current Phase Construction
Legislative District 8
Congressional District 4
Federal Route Number 9999
Project Length 0.30 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Carlo D'Alissandro
Contact Email cdalessandro@ci.richland.wa.us
TIB Engineer Jonathan Heusman
Last Payment Date 06/07/2022
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   03/25/2022
Delayed Project Date 03/25/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 04/30/2022 05/04/2022
Bid Auth. Approval 04/30/2022 05/04/2022
Construction Approval 04/30/2022 05/04/2022
Project Closeout 12/15/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 450,000 450,000
Other Construction 0 0
Total Construction 450,000 450,000
     
Total TIB Funding 450,000 450,000

Local Funding Partners

Funding Amount Percent
RICHLAND 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
Sidewalk Connectivity Improvements Pedestrian Mar 2022 $250,000 $250,000
Design and construct approx. 1300 ft of sidewalk on Gala Way (irrigation canal to Hunter, McMurray St (Forest to Mahan), and Humphreys St (Wright to Winslow) and plus additional sidewalk on various routes (as indicated on City Sidewalk Route Infill List). Associated ADA curg ramps, curb and gutter will also be addressed. City will utilize Sidewalk Route Infill List to prioritize as ROW community acceptance and funding allows.
Pedestrian Crossing Improvements Pedestrian Mar 2022 $150,000 $150,000
Design and construct RRFB for crosswalks at various locations (as indicated on City RRFB Ranking Matrix). Associated signs, pavement markings, ADA curb ramps, curb and gutter will also be addressed. City will utilize RRFB Ranking Matrix to prioritize as ROW, community acceptance and funding allows.
Speed Study Planning Mar 2022 $50,000 $50,000
Perform a speed study of city streets with injury minimization approach.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.