City of Moses Lake's Complete Streets Award
C-E-162(001)-1
C-E-162(001)-1
Complete Streets Award
Jan 2017 Selection
FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000
County: Grant | Legislative District: 13 | Project Length: 0.10 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/27/2017
Project Information
Lead Agency | MOSES LAKE |
Funding Year | 2018 |
Program | CSP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Richard Law |
Contact Email | rlaw@cityofml.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/27/2017 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 02/07/2017 | |
Delayed Project Date | 07/01/2019 | |
DAHP Assessment Date | ||
Predesign Approval | 12/19/2016 | |
Design Approval | 02/15/2017 | |
Bid Auth. Approval | 02/15/2017 | |
Construction Approval | 02/15/2017 | 02/22/2017 |
Project Closeout | 12/31/2019 | 11/13/2019 |
Audit Date | 11/18/2019 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 250,000 | 250,000 |
Other Construction | 0 | 0 |
Total Construction | 250,000 | 250,000 |
Total TIB Funding | 250,000 | 250,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MOSES LAKE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Replace non-compliant access ramps in City R.O.W. | Pedestrian | Dec 2016 | $193,000 | $ 0 | |
The City has 1,508 non-compliant ramps. The City is currently working with the public, as part of our transition plan, to prioritize the needs of the community. (See Spokesman Review article date Feb 2, 2017) | |||||
New access ramps in City R.O.W. where no ramps exist. | Pedestrian | Dec 2016 | $15,000 | $ 0 | |
The City has identified location where new ramps could be installed in City R.O.W. Location will be presented to citizens to be prioritized based on their input. (See Spokesman Review article on Feb 2, 2017) | |||||
Road Diet- Hill Avenue Configuration | Bicycle | Dec 2016 | $ 0 | $ 0 | |
After chip sealing this 4,275-foot section of road, the complete streets money will be used to restripe the 4-lane road to include 3-lanes plus a bike lane in each direction. | |||||
Audible pedestrian buttons to replace existing buttons at signalized intersections |
Pedestrian | Apr 2017 | $42,000 | $ 0 | |
At the City Feb. 6th public meeting about the ADA Transition Plan, a vision impaired citizen requested audiable signal crossings along Pioneer Way and in the downtown area. This would reslut in the purchase of 56 pedestrian buttons that will be installed by City staff. |
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |