City of East Wenatchee's Complete Streets Award
C-E-161(002)-1
C-E-161(002)-1
Complete Streets Award
March 2022 Selection
FY 2023 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $300,000
County: Douglas | Legislative District: 12 | Project Length: 0.22 | TIB Engineer: Andrew Beagle | Last Payment Date: 06/07/2022
Project Information
Lead Agency | EAST WENATCHEE |
Funding Year | 2023 |
Program | CSP |
Current Phase | Construction |
Legislative District | 12 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.22 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Garren Melton |
Contact Email | gmelton@eastwenatcheewa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | 06/07/2022 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/31/2022 | |
Delayed Project Date | 03/31/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 05/01/2022 | 05/05/2022 |
Bid Auth. Approval | 05/01/2022 | 05/05/2022 |
Construction Approval | 11/01/2022 | 05/05/2022 |
Project Closeout | 07/15/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 300,000 | 300,000 |
Other Construction | 0 | 0 |
Total Construction | 300,000 | 300,000 |
Total TIB Funding | 300,000 | 300,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
EAST WENATCHEE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Installl sidewalk on N Grover Ave | Mar 2022 | $200,000 | $ 0 | ||
Fill in various sidewalk gaps between 10th St NE and 12th Street NE, providing a complete sidewalk path from 12th Street to Eastmont Jr. High. | |||||
Install signalized pedestrian crossings | Mar 2022 | $100,000 | $ 0 | ||
Install an actuated rectangular flashing beacon syste at two locations: 15th St NE and N Baker, and at 15th St NE and Eastmone Ave. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |