TIB Project Information

City of Wenatchee's Complete Streets Award

C-E-160(003)-1

C-E-160(003)-1
Complete Streets Award

March 2022 Selection

FY 2023 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $600,000

County: Chelan   |   Legislative District: 12   |   Project Length: 0.50   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 07/15/2022

Project Information

Lead Agency WENATCHEE
Funding Year 2023
Program CSP
Current Phase Construction
Legislative District 12
Congressional District 8
Federal Route Number 9999
Project Length 0.50 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Ryan Harmon
Contact Email rharmon@wenatcheewa.gov
TIB Engineer Andrew Beagle
Last Payment Date 07/15/2022
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   03/30/2022
Delayed Project Date 03/30/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 04/01/2023 04/15/2022
Bid Auth. Approval 04/01/2023 04/15/2022
Construction Approval 11/01/2023 04/15/2022
Project Closeout 12/01/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 600,000 600,000
Other Construction 0 0
Total Construction 600,000 600,000
     
Total TIB Funding 600,000 600,000

Local Funding Partners

Funding Amount Percent
WENATCHEE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Complete Streets Workplan

Item Type of Work Date Added Est. Cost Actual Cost Complete
High Pedestrian Use Areas - Construct Sidewalks Pedestrian Mar 2022 $185,000 $ 0
Construct sidewalk on streets where no sidewalk currently exists, prioritize locations based on Link Transit rider data and proximity to schools, parks, grocery stores, etc.
Pedestrian Master Plan Pedestrian Mar 2022 $50,000 $ 0
Utilize data athered from public outreach efforts performed in 2018 to finalize development of Pedestrian Master Plan.
Bicycle Infrastructure, Delineation, and Channelization
Improvements
Bicycle Mar 2022 $90,000 $ 0
Re-channelize Cherry Street to add bike lanes in conjunction with 2022 Paving Project. Fill in existing bike-lane gap on Maple Street from Gabriella to Western Ave. Purchase/install new bike racks. Identify locations for bicycle detection marking at existing signals. Install bicycle way finding signs throughout the City. Install bicycle video detection at signal on First and Miller.
Worthen Street Pedestrian and Bicycle Improvements Pedestrian; Bicycle Mar 2022 $215,000 $ 0
Enhance channelization, ped/bike delineation, and add illumination to a 2,500-ft length of Worthen Street from Thurston St to Hale Skate Park parking lot, where the Apple Capital Recreational Loop Trail runs along the shoulder of the existing vehicle traveled way.
Okanogan/Orondo Bulb Out and Rechannelization Pedestrian; Bicycle Mar 2022 $60,000 $ 0
Implement recommendations from the Complete Streets Leadership Academy Demonstration Project Pop-up event at intersection of Okanogan, Methow, and Orondo Avenue to address pedestrian and bicycle connectivity, in conjunction with 2022 Paving Project.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.