City of Wenatchee's Complete Streets Award
C-E-160(001)-1
C-E-160(001)-1
Complete Streets Award
Jan 2017 Selection
FY 2018 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $250,000
County: Chelan | Legislative District: 12 | Project Length: 0.10 | TIB Engineer: Andrew Beagle | Last Payment Date: 07/06/2017
Project Information
Lead Agency | WENATCHEE |
Funding Year | 2018 |
Program | CSP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | Local Access |
Type of Work | Pedestrian |
Project Contact | Gary Owen |
Contact Email | gowen@wenatchee.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | 07/06/2017 |
Cultural Resource Assessment |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 01/27/2017 | |
Delayed Project Date | 07/01/2019 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | ||
Construction Approval | 02/15/2017 | 02/14/2017 |
Project Closeout | 12/31/2018 | 10/31/2018 |
Audit Date | 11/01/2018 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 250,000 | 250,000 |
Other Construction | 0 | 0 |
Total Construction | 250,000 | 250,000 |
Total TIB Funding | 250,000 | 250,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WENATCHEE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
---|---|---|---|---|---|
Pedestrian Master Plan | Planning | Feb 2017 | $25,000 | $5,000 | |
Complete development of a pedestrian master plan including necessary ADA transition plan elements addressing accessibility in the public rights of way. | |||||
Pedestrian and Bicycle Connections | Pedestrian; Bicycle | Feb 2017 | $100,000 | $80,000 | |
Fill sidewalk system gaps prioritizing school walk routes and other criteria identified as high priority in the master plan. Construct multi-use pathways connections. | |||||
Illumination System Upgrades | Pedestrian | Feb 2017 | $50,000 | $50,000 | |
Improve illumination levels at high pedestrian locations. | |||||
Mission/Stevens Landscaping and Pedestrian Connection | Pedestrian; Aesthetics | Feb 2017 | $75,000 | $115,000 | |
Soften the look of the Mission/Stevens intersection with landscaping around the old west leg and formalize a pedestrian connection. |
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |