Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Woodland's Guild Road and W Scott Avenue

8-5-954(006)-1

8-5-954(006)-1
Guild Road and W Scott Avenue

Schurman Way to Railroad Tracks

FY 2020 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,243,885

County: Cowlitz/Clark   |   Legislative District: 20   |   Project Length: 0.35   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 12/08/2023

Project Information

Lead Agency WOODLAND
Funding Year 2020
Program UAP
Current Phase Construction
Legislative District 20
Congressional District 3
Federal Route Number 6876
Project Length 0.35 mi.
ADT 2,500
Functional Class Collector
Type of Work Reconstruction
Project Contact Tracy Coleman
Contact Email colemant@ci.woodland.wa.us
TIB Engineer Chris Langhoff
Last Payment Date 12/08/2023
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2018
Delayed Project Date 07/01/2023  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2019 01/23/2019
Bid Auth. Approval 05/01/2023 05/01/2023
Construction Approval 06/01/2023 06/05/2023
Project Closeout 03/31/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 130,252 144,725
Right of Way 0 0
Total Design 130,252 144,725
     
Construction Engineering 130,252 144,725
Construction Contract 868,388 1,092,645
Other Construction 0 0
Total Construction 998,640 1,237,370
     
Funding Increase 114,993  
Total TIB Funding 1,243,885 1,382,095

Local Funding Partners

Funding Amount Percent
WOODLAND 138,210 10.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 138,210 1.0%

Project Description

The existing asphalt will be removed and the road base will be treated with 12' of CTB. The new road base will then be overlayed with 4' of Asphalt. The existing asphalt will not be pulverized and left in place since existing curbs on both sides define the profile. The project will also complete gaps in the existing sidewalk system along West Scott Avenue. The sidewalk will also be extended approximately 250' south along Pacific Avenue to connect to the existing sidewalk system. Existing curb ramps and driveway entrances will be brought up to current ADA standards.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments