West Scott Avenue and Guild Road are major collector streets and provide access to numerous commercial and industrial businesses. The existing asphalt has reached the end of its life and needs to be replaced.
Projects — TIB Project Information
TIB Project Information
City of Woodland's Guild Road and W Scott Avenue
8-5-954(006)-1
8-5-954(006)-1
Guild Road and W Scott Avenue
Schurman Way to Railroad Tracks
FY 2020 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,243,885
County: Cowlitz/Clark | Legislative District: 20 | Project Length: 0.35 | TIB Engineer: Chris Langhoff | Last Payment Date: 12/08/2023
Project Information
Lead Agency | WOODLAND |
Funding Year | 2020 |
Program | UAP |
Current Phase | Construction |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 6876 |
Project Length | 0.35 mi. |
ADT | 2,500 |
Functional Class | Collector |
Type of Work | Reconstruction |
Project Contact | Tracy Coleman |
Contact Email | colemant@ci.woodland.wa.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 12/08/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2018 | |
Delayed Project Date | 07/01/2023 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2019 | 01/23/2019 |
Bid Auth. Approval | 05/01/2023 | 05/01/2023 |
Construction Approval | 06/01/2023 | 06/05/2023 |
Project Closeout | 09/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 130,252 | 144,725 |
Right of Way | 0 | 0 |
Total Design | 130,252 | 144,725 |
Construction Engineering | 130,252 | 144,725 |
Construction Contract | 868,388 | 1,092,645 |
Other Construction | 0 | 0 |
Total Construction | 998,640 | 1,237,370 |
Funding Increase | 114,993 | |
Total TIB Funding | 1,243,885 | 1,382,095 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WOODLAND | 138,210 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 138,210 | 1.0% |
Project Description
The existing asphalt will be removed and the road base will be treated with 12' of CTB. The new road base will then be overlayed with 4' of Asphalt. The existing asphalt will not be pulverized and left in place since existing curbs on both sides define the profile. The project will also complete gaps in the existing sidewalk system along West Scott Avenue. The sidewalk will also be extended approximately 250' south along Pacific Avenue to connect to the existing sidewalk system. Existing curb ramps and driveway entrances will be brought up to current ADA standards.
Existing Condition
Project Benefits
- Improves arterial network;
- Opens corridor to truck volumes;
- Restores structural condition;
- Incorporates recycled materials
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |