This project will complete the final segment of the SE 20th Street/NW 38th Ave. corridor that runs between SE 192nd Ave. in Vancouver and NW Dahlia Drive in Camas. It will reconstruct an old two-lane roadway with drainage ditches on both sides of the road and no bike lanes. The project will satisfy the need for a three-lane arterial roadway and will include construction of concrete sidewalk, a concrete multi-use path and bike lanes.
Projects — TIB Project Information
TIB Project Information
City of Camas's NW 38th Avenue
8-5-185(010)-1
8-5-185(010)-1
NW 38th Avenue
NW Parker St to Grass Valley Park
FY 2025 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,692,384
County: Clark | Legislative District: 17 | Project Length: 0.45 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | CAMAS |
| Funding Year | 2025 |
| Program | UAP |
| Current Phase | Construction |
| Legislative District | 17 |
| Congressional District | 3 |
| Federal Route Number | 7031 |
| Project Length | 0.45 mi. |
| ADT | 6,654 |
| Functional Class | Minor |
| Type of Work | Major Widening |
| Project Contact | James E Carothers |
| Contact Email | jcarothers@cityofcamas.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | Section 106 |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/01/2023 | |
| Delayed Project Date | 01/01/2025 | |
| DAHP Assessment Date | 06/23/2024 | |
| Predesign Approval | ||
| Design Approval | 12/19/2023 | 12/15/2023 |
| Bid Auth. Approval | 01/01/2024 | 01/05/2024 |
| Construction Approval | 05/16/2024 | 06/23/2024 |
| Project Closeout | 11/30/2025 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 198,951 | 794,272 |
| Construction Contract | 1,493,433 | 6,592,065 |
| Other Construction | 0 | 0 |
| Total Construction | 1,692,384 | 7,386,337 |
| Total TIB Funding | 1,692,384 | 7,386,337 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| CAMAS | 649,654 | 8.8% |
| WSDOT Funding | 0 | 0.0% |
| FHWA-STBG Grant Funds from RTC | 5,044,299 | 74.9% |
| Total Local Funding | 5,693,953 | 83.7% |
Project Description
The project will complete safety, connectivity and accessibility goals by removing roadside hazards and constructing 0.45 miles of three-lane arterial roadway with a center median/left turn lane, sidewalk, bike lanes, a multi-use path, roadway illumination, wheelchair ramps, and rectangular rapid flashing beacons.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Improves arterial network;
- Removes ADA barriers
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||