City of Milton's Pacific Highway S (SR 99)

8-1-132(004)-1

8-1-132(004)-1
Pacific Highway S (SR 99)

Porter Way Intersection

FY 2021 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $3,380,530

County: Pierce/King   |   Legislative District: 30   |   Project Length: 0.20   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 04/03/2024

Project Information

Lead Agency MILTON
Funding Year 2021
Program UAP
Current Phase Construction
Legislative District 30
Congressional District 8
Federal Route Number 0099
Project Length 0.20 mi.
ADT 30,000
Functional Class Principal
Type of Work Minor Widening
Project Contact Dustin Madden
Contact Email dmadden@cityofmilton.net
TIB Engineer Greg Armstrong
Last Payment Date 04/03/2024
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2019
Delayed Project Date 07/01/2024  
DAHP Assessment Date   01/11/2021
Predesign Approval
Design Approval 01/01/2020 12/06/2019
Bid Auth. Approval 05/21/2022 05/26/2022
Construction Approval 01/18/2023 01/18/2023
Project Closeout 12/31/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 317,700 479,287
Right of Way 40,500 32,100
Total Design 358,200 511,387
     
Construction Engineering 253,935 525,300
Construction Contract 2,327,456 2,943,929
Other Construction 0 0
Total Construction 2,581,391 3,469,229
     
Funding Increase 440,939  
Total TIB Funding 3,380,530 3,980,616

Local Funding Partners

Funding Amount Percent
MILTON 185,086 4.6%
WSDOT Funding 0 0.0%
Bridge Developement Partners  415,000 10.4%
 
 
 
 
 
 
 
Total Local Funding 600,086 15.0%

Project Description

'The city plans to enlarge the intersection through existing and acquired Right of Way. This will make it feasable to add another lane to Porter Way traveling from east to west toward the intersection allowing for dedicated left, through and right turn lanes. Currently the left and through traffic lane share one lane and the signalization does not support steady movement of traffic. This will also make it possible to size the intersection for trucks and trailers who frequent the intersection because of close proximity to the Port of Tacoma and the Fife Warehousing Complex. The proposed plan will increase mobility for vehicles and pedestrians, reduce back ups and waiting times, and size the intersection properly for the large trucks and large traffic volumes that utilize Pacific Highway S (SR-99) and Porter Way. Installing sidewalks, ADA ramps, upgrading the signal system with mast arms, improving the radii of the intersection at two locations and incoporating street lighting are additional improvements to the intersection.'

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.