Cherry Lane, Kosmos Lane, Tilton Way, Crystal Way, and Collar Ave all have a PCR score under 44, indicating a need for reconstruction. These streets serve the densely populated neighborhood in the northwestern portion of the City, including the Sunny Acres subdivision, Morton Seventh-day Adventist Church, and
Projects — TIB Project Information
TIB Project Information
City of Morton's 2022 Overlay Award
6-W-961(004)-1
6-W-961(004)-1
2022 Overlay Award
City Wide
FY 2024 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $468,514
County: Lewis | Legislative District: 20 | Project Length: 0.56 | TIB Engineer: Chris Langhoff | Last Payment Date: 12/30/2024
Project Information
| Lead Agency | MORTON |
| Funding Year | 2024 |
| Program | SCAP |
| Current Phase | Audit |
| Legislative District | 20 |
| Congressional District | 3 |
| Federal Route Number | 9999 |
| Project Length | 0.56 mi. |
| ADT | 250 |
| Functional Class | TIB Arterial |
| Type of Work | Reconstruction |
| Project Contact | Dan Mortensen |
| Contact Email | mayor@visitmorton.com |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 12/30/2024 |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/02/2022 | |
| Delayed Project Date | 07/01/2025 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2023 | 12/15/2022 |
| Bid Auth. Approval | 06/30/2024 | 06/22/2024 |
| Construction Approval | 07/30/2024 | 07/19/2024 |
| Project Closeout | 12/31/2024 | 12/23/2024 |
| Audit Date | 12/30/2024 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 53,443 | 50,000 |
| Right of Way | 0 | 0 |
| Total Design | 53,443 | 50,000 |
| Construction Engineering | 53,443 | 70,000 |
| Construction Contract | 356,534 | 521,980 |
| Other Construction | 0 | 0 |
| Total Construction | 409,977 | 591,980 |
| Funding Increase | 50,852 | |
| Funding Surplus | - 45,758 | |
| Total TIB Funding | 468,514 | 641,980 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| MORTON | 1,886 | 0.3% |
| WSDOT Funding | 0 | 0.0% |
| State Legislative Appropriation | 171,580 | 26.7% |
| Total Local Funding | 173,466 | 27.0% |
Project Description
The proposed roadway improvements will pulverize the existing roadway to construct a suitable roadway base, prelevel the roadway with crushed surfacing material, and repave the roadway. 10-foot travel lanes will be established.
Existing Condition
Project Benefits
- Restores structural condition;
- Incorporates recycled materials
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||