North Forrest Street is in poor condition and requires reconstruction. North Forrest Street serves a residential area, which currently lacks pedestrian facilities. Some existing catch basins are in poor condition.
Projects — TIB Project Information
TIB Project Information
City of Westport's N Forrest Street
6-W-960(006)-1
6-W-960(006)-1
N Forrest Street
Ocean Ave to 400 ft n/o Sprague Ave
FY 2024 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $750,756
County: Grays Harbor | Legislative District: 19 | Project Length: 0.36 | TIB Engineer: Chris Langhoff | Last Payment Date: 07/17/2024
Project Information
Lead Agency | WESTPORT |
Funding Year | 2024 |
Program | SCAP |
Current Phase | Construction |
Legislative District | 19 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 0.36 mi. |
ADT | 550 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Devin Jackson |
Contact Email | devin@jacksoncivil.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 07/17/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 12/23/2022 |
Bid Auth. Approval | 05/15/2024 | 05/16/2024 |
Construction Approval | 06/15/2024 | 06/28/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 85,500 | 90,000 |
Right of Way | 0 | 0 |
Total Design | 85,500 | 90,000 |
Construction Engineering | 47,500 | 75,000 |
Construction Contract | 540,008 | 625,270 |
Other Construction | 0 | 0 |
Total Construction | 587,508 | 700,270 |
Funding Increase | 77,748 | |
Total TIB Funding | 750,756 | 790,270 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WESTPORT | 39,514 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 39,514 | 5.0% |
Project Description
The project proposes to reconstruct North Forrest Street, adding curb gutter and sidewalk on one side. Existing stormwater facilities shall be replaced/relocated within proposed curb and gutter line.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers;
- Incorporates recycled materials
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |