North Forrest Street is in poor condition and requires reconstruction. North Forrest Street serves a residential area, which currently lacks pedestrian facilities. Some existing catch basins are in poor condition.
Projects — TIB Project Information
TIB Project Information
City of Westport's N Forrest Street
6-W-960(006)-1
6-W-960(006)-1
N Forrest Street
Ocean Ave to 400 ft n/o Sprague Ave
FY 2024 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $757,333
County: Grays Harbor | Legislative District: 19 | Project Length: 0.36 | TIB Engineer: Chris Langhoff | Last Payment Date: 05/01/2025
Project Information
| Lead Agency | WESTPORT | 
| Funding Year | 2024 | 
| Program | SCAP | 
| Current Phase | Audit | 
| Legislative District | 19 | 
| Congressional District | 6 | 
| Federal Route Number | 9999 | 
| Project Length | 0.36 mi. | 
| ADT | 550 | 
| Functional Class | TIB Arterial | 
| Type of Work | Reconstruction | 
| Project Contact | Devin Jackson | 
| Contact Email | devin@jacksoncivil.com | 
| TIB Engineer | Chris Langhoff | 
| Last Payment Date | 05/01/2025 | 
| Cultural Resource Assessment | Not Required | 
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/02/2022 | |
| Delayed Project Date | 07/01/2025 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2023 | 12/23/2022 | 
| Bid Auth. Approval | 05/15/2024 | 05/16/2024 | 
| Construction Approval | 06/15/2024 | 06/28/2024 | 
| Project Closeout | 04/30/2025 | 04/25/2025 | 
| Audit Date | 05/01/2025 | |
| Withdrawn Date | 
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 | 
| Design Study | 0 | 0 | 
| Total Predesign | 0 | 0 | 
| Special Study | 0 | 0 | 
| Design | 85,500 | 90,000 | 
| Right of Way | 0 | 0 | 
| Total Design | 85,500 | 90,000 | 
| Construction Engineering | 47,500 | 77,932 | 
| Construction Contract | 540,008 | 631,606 | 
| Other Construction | 0 | 0 | 
| Total Construction | 587,508 | 709,538 | 
| Funding Increase | 84,325 | |
| Total TIB Funding | 757,333 | 799,538 | 
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| WESTPORT | 42,205 | 5.3% | 
| WSDOT Funding | 0 | 0.0% | 
| Total Local Funding | 42,205 | 5.3% | 
Project Description
The project proposes to reconstruct North Forrest Street, adding curb gutter and sidewalk on one side. Existing stormwater facilities shall be replaced/relocated within proposed curb and gutter line.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Restores structural condition;
- Removes ADA barriers;
- Incorporates recycled materials
Project Delays
| Delay Type | Resolution Date | Comments | 
|---|---|---|
| No delayed project history. | ||