City of Montesano's Lake Sylvia Road Sidewalk
6-W-957(I14)-1
6-W-957(I14)-1
Lake Sylvia Road Sidewalk
McBryde Ave to Nevills Lane
FY 2026 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $45,509
County: Grays Harbor | Legislative District: 24 | Project Length: 0.16 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | MONTESANO |
Funding Year | 2026 |
Program | SCAP |
Current Phase | Construction |
Legislative District | 24 |
Congressional District | 6 |
Federal Route Number | 5185 |
Project Length | 0.16 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Mike Olden |
Contact Email | molden@montesano.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 07/09/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | 08/05/2024 | |
Predesign Approval | ||
Design Approval | 07/30/2024 | 08/05/2024 |
Bid Auth. Approval | 07/30/2024 | 08/05/2024 |
Construction Approval | 08/30/2024 | 08/12/2024 |
Project Closeout | 12/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 2,017 | 29,000 |
Right of Way | 0 | 0 |
Total Design | 2,017 | 29,000 |
Construction Engineering | 2,088 | 46,000 |
Construction Contract | 43,283 | 594,000 |
Other Construction | 0 | 0 |
Total Construction | 45,371 | 640,000 |
Funding Surplus | - 1,879 | |
Total TIB Funding | 45,509 | 669,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MONTESANO | 272,471 | 40.7% |
WSDOT Funding | 0 | 0.0% |
FHWA TA | 351,020 | 51.5% |
Total Local Funding | 623,491 | 92.2% |
Project Description
Install sidewalk and an extruded curb barrier along Sylvia Lake Road including safety measures to slow traffic and drainage improvements to provide the first phase of a safe route for access to recreation.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |