Roadway is 2 lanes wide without pedestrian accommodations
Projects — TIB Project Information
TIB Project Information
City of Montesano's Lake Sylvia Road Sidewalk
6-W-957(I14)-1
6-W-957(I14)-1
Lake Sylvia Road Sidewalk
McBryde Ave to Nevills Lane
FY 2026 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $45,509
County: Grays Harbor | Legislative District: 24 | Project Length: 0.16 | TIB Engineer: Chris Langhoff | Last Payment Date: 09/15/2025
Project Information
| Lead Agency | MONTESANO |
| Funding Year | 2026 |
| Program | SCAP |
| Current Phase | Audit |
| Legislative District | 24 |
| Congressional District | 6 |
| Federal Route Number | 5185 |
| Project Length | 0.16 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Pedestrian |
| Project Contact | Mike Olden |
| Contact Email | molden@montesano.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 09/15/2025 |
| Cultural Resource Assessment | Section 106 |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 07/09/2024 | |
| Delayed Project Date | 07/01/2027 | |
| DAHP Assessment Date | 08/05/2024 | |
| Predesign Approval | ||
| Design Approval | 07/30/2024 | 08/05/2024 |
| Bid Auth. Approval | 07/30/2024 | 08/05/2024 |
| Construction Approval | 08/30/2024 | 08/12/2024 |
| Project Closeout | 08/30/2025 | 09/12/2025 |
| Audit Date | 09/15/2025 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 2,017 | 24,000 |
| Right of Way | 0 | 0 |
| Total Design | 2,017 | 24,000 |
| Construction Engineering | 2,088 | 42,727 |
| Construction Contract | 43,283 | 608,975 |
| Other Construction | 0 | 0 |
| Total Construction | 45,371 | 651,702 |
| Funding Surplus | - 1,879 | |
| Total TIB Funding | 45,509 | 675,702 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| MONTESANO | 279,173 | 41.3% |
| WSDOT Funding | 0 | 0.0% |
| FHWA TA | 351,020 | 51.5% |
| Total Local Funding | 630,193 | 92.8% |
Project Description
Install sidewalk and an extruded curb barrier along Sylvia Lake Road including safety measures to slow traffic and drainage improvements to provide the first phase of a safe route for access to recreation.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||