China Garden Road is one of the main roads providing access from unincorporated Cowlitz County the the core of the City of Kalama. The existing hill to the south of the road drops away quickly, and there is no guardrail to stop errant vehicles. The existing asphalt is showing fatigue (cracking), allowing water to infiltrate into the subgrade. Hydrodynamic pressure from traffic loading and freeze-thaw action increase pavement degradation.
Projects — TIB Project Information
TIB Project Information
City of Kalama's China Garden Road
6-W-953(012)-1
6-W-953(012)-1
China Garden Road
S 10th St to Gwynne Rd
FY 2025 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $858,069
County: Cowlitz | Legislative District: 20 | Project Length: 0.30 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | KALAMA |
Funding Year | 2025 |
Program | SCAP |
Current Phase | Design |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | K086 |
Project Length | 0.30 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Reconstruction |
Project Contact | Kelly Rasmusen |
Contact Email | krasmussen@cityofkalama.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2024 | 12/14/2023 |
Bid Auth. Approval | 03/01/2025 | |
Construction Approval | 03/21/2025 | |
Project Closeout | 10/01/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 70,253 | 73,950 |
Right of Way | 0 | 0 |
Total Design | 70,253 | 73,950 |
Construction Engineering | 84,322 | 88,760 |
Construction Contract | 703,494 | 740,520 |
Other Construction | 0 | 0 |
Total Construction | 787,816 | 829,280 |
Total TIB Funding | 858,069 | 903,230 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KALAMA | 45,162 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 45,162 | 5.0% |
Project Description
The roadway and subgrade will be excavated and replaced. By adding guardrail to the south side of the road, motorists will be protected from unrecoverable falls.
Existing Condition
Project Benefits
- Improves safety;
- Restores structural condition
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |