The current stop conditions on Emery Avenue causes traffic is backed up on Emery causing significant delays. In addition there is a high volkume pedestrian traffic crossing from the main community (south of SR 162) to the Post Office (north of SR 162).
Projects — TIB Project Information
TIB Project Information
Town of South Prairie's Pioneer Way E (SR 162)
6-P-815(003)-1
6-P-815(003)-1
Pioneer Way E (SR 162)
Emery St
FY 2025 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $785,622
County: Pierce | Legislative District: 31 | Project Length: 0.10 | TIB Engineer: Greg Armstrong | Last Payment Date: 06/23/2025
Project Information
| Lead Agency | SOUTH PRAIRIE |
| Funding Year | 2025 |
| Program | SCAP |
| Current Phase | Design |
| Legislative District | 31 |
| Congressional District | 8 |
| Federal Route Number | 0162 |
| Project Length | 0.10 mi. |
| ADT | 2,598 |
| Functional Class | Minor |
| Type of Work | Traffic Control |
| Project Contact | Terri Berry |
| Contact Email | clerk@townofsp.com |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | 06/23/2025 |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/01/2023 | |
| Delayed Project Date | 07/01/2026 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 07/12/2024 | 12/19/2023 |
| Bid Auth. Approval | 02/01/2026 | |
| Construction Approval | 03/01/2026 | |
| Project Closeout | 12/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 108,778 | 108,778 |
| Right of Way | 0 | 0 |
| Total Design | 108,778 | 108,778 |
| Construction Engineering | 72,519 | 72,519 |
| Construction Contract | 604,325 | 604,325 |
| Other Construction | 0 | 0 |
| Total Construction | 676,844 | 676,844 |
| Total TIB Funding | 785,622 | 785,622 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| SOUTH PRAIRIE | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
This project will construct a compact roundabout at the intersection of SR 162 and Emery Avenue with pedestrian crossing improvements on the east leg.
Existing Condition
Project Benefits
- Improves safety;
- Improves pedestrian safety;
- Improves vehicle and pedestrian access
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||