The sections of roadway have significant pavement failures causing numerous longitudinal and transverse cracks to the asphalt and poor or no drainage facilities which contributes to pavement edge erosion. There is also a need for a sidewalk along 7th Street to provide access to the governmental services, businesses, restaurants, and recreational park (Loges).
Projects — TIB Project Information
TIB Project Information
City of Zillah's 8th Street Improvements
6-E-947(016)-1
6-E-947(016)-1
8th Street Improvements
Rainier Ave to First Ave
FY 2025 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $446,976
County: Yakima | Legislative District: 15 | Project Length: 0.12 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/20/2024
Project Information
Lead Agency | ZILLAH |
Funding Year | 2025 |
Program | SCAP |
Current Phase | Construction |
Legislative District | 15 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.12 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Ardele Steele |
Contact Email | Asteele@cityofzillah.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/20/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | 01/12/2024 | |
Predesign Approval | ||
Design Approval | 01/22/2024 | 01/05/2024 |
Bid Auth. Approval | 06/15/2024 | 06/07/2024 |
Construction Approval | 07/09/2024 | 07/18/2024 |
Project Closeout | 10/11/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 60,080 | 66,100 |
Right of Way | 0 | 0 |
Total Design | 60,080 | 66,100 |
Construction Engineering | 68,664 | 75,926 |
Construction Contract | 429,132 | 385,236 |
Other Construction | 13,500 | 0 |
Total Construction | 511,296 | 461,162 |
Funding Surplus | - 124,400 | |
Total TIB Funding | 446,976 | 527,262 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ZILLAH | 80,286 | 15.2% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 80,286 | 15.2% |
Project Description
This project will provide stormwater and utility enhancements, and roadway improvements with pedestrian curb bump outs. Project will grind roadway and reshape to establish cross slope before paving 2' overlay. Project will also install a sidewalk along the west side of 7th Street from Railroad Avenue to 1st Avenue to address the community need.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |